← all projects
Energystrategic

Flue-Gas Desulfurisation (FGD) Programme at Bełchatów Power Plant

completedstage: operationaldelivered
PLN 9.0 billion
estimate · data from 2020net or gross: not recorded≈ PLN 9.0 billion (value-by-stage, est., nominal)funding: the investor’s own funds, state special fund, other sourcesThe figure covers the cumulative outlay on all pro-environmental investments at the Bełchatów power plant up to 2020, not only on flue-gas desulfurisation.

A long-running pro-environmental programme at Bełchatów Power Plant (Rogowiec, Kleszczów municipality, Łódź Voivodeship), the largest lignite-fired thermal power plant in Poland, today part of PGE Górnictwo i Energetyka Konwencjonalna S.A. within the PGE Group. It was at Bełchatów that Poland's first flue-gas desulfurisation (FGD) installation was commissioned in 1994, carried out as part of the government's "Programme for SO2 reduction in the power industry". A wet limestone-gypsum method was used, with a desulfurisation efficiency of over 95%, meaning the resulting gypsum is a fully marketable commercial product. The first installations covered units 1 and 2, and in subsequent years FGD was expanded and modernised on further units (including units 3 to 6 and 8 to 12) and on the largest, 858 MW unit commissioned in 2011. Bełchatów Power Plant allocated a total of approximately PLN 9 billion to pro-environmental investments, of which flue-gas desulfurisation was the pioneering and flagship element (as of 2020, PGE data). Thanks to the technologies applied, from the 1990s to 2020 sulphur dioxide emissions were reduced by more than 89%, nitrogen oxides by 45%, and particulates by 97%. The approximately PLN 9 billion figure is the cumulative nominal outlay on all pro-environmental investments over the entire period, not the cost of a single installation, nor a value expressed in constant prices of a single year.

How it went

Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet. How to read this section

Deliverydelivered[1]
Utilisationin use[1]
redukcja emisji SO2 dzięki instalacjom odsiarczania spalin
Current
emisja dwutlenku siarki zredukowana o ponad 89 proc. (lata 90. – 2020)

Timeline

  1. Delivery1994

Change history

  • 1994stage: operational

Significance

Bełchatów Power Plant was a pioneer of flue-gas desulfurisation in Poland. The installation commissioned in 1994 was the first of its kind in the country and set the standard for the entire national power industry implementing the government's SO2 emission reduction programme. Cumulative pro-environmental outlays of around PLN 9 billion, together with the gradual fitting of successive units with desulfurisation, denitrification and dust-removal installations, made it possible to cut sulphur dioxide emissions by more than 89% at the largest thermal power plant in Poland, which had a significant impact on improving air quality nationwide.

Sources 6 · 6 independent · 5 archived

Every fact on this card comes from the sources below. Next to each source – which fields it supports.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Energetyka2420 Jan 2020
    StatusStageCostDeliveryUtilisation
    Status · UtilisationDzięki zastosowaniu najnowocześniejszych na świecie technologii, począwszy od lat 90. do chwili obecnej, w Elektrowni Bełchatów emisja dwutlenku siarki zredukowana została o ponad 89 proc., tlenków azotu o 45 proc., a pyłów o 97 proc.
    Stage · DeliveryTo właśnie w Bełchatowie uruchomiono w 1994 roku pierwszą w Polsce instalację odsiarczania spalin
    Costłącznie na inwestycje proekologicznie przeznaczonych zostało ok. 9 mld zł
  2. energiapress.pl22 Jan 2020
  3. Powermeetings.eu
    Investor
    InvestorPGE Górnictwo i Energetyka Konwencjonalna wdrożyła w Elektrowni Bełchatów program zapobiegający powstawaniu osadów twardych w absorberach instalacji odsiarczania spalin, a tym samym usprawniający ten proces.
  4. PGE GiEK – Elektrownia Bełchatów
  5. Funding
    FundingFinansowanie inwestycji pochodziło ze środków własnych oraz pożyczki z WFOŚiGW w Łodzi, a także z Norweskiego Mechanizmu Finansowego za pośrednictwem NFOŚiGW