Corrections

What we corrected.

Everything we said wrong and what we did about it. 90 entries, the oldest from 2026-08-28. A record's verification date tracks the monthly review rather than a single fix, so the fixes live here.

What lands here

A change after which the site says something DIFFERENT from what it said, not a plain addition. Adding a source to a record is not a correction; changing an owner, an amount, or an assessment of schedule, cost or scope is. 47 of 90 name a specific record, the rest concern the way the site presented its figures.

  1. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The losses card showed “17 bn” for an amount of 16800 mln, even though the source quote under the same field says “PLN 16.8 billion” - the shared amount-formatting function zeroed the decimal place for every value from 10 bn upward, regardless of whether that specific amount actually has a nonzero tenth. Three panel judges independently found this on the Olefiny III card.
    Is now
    The amount formatter got an optional flag that shows one decimal place when the amount is not an exact multiple of a thousand million - turned on only for losses (write-offs, allegations, settled), not for costs, where zeroing the decimal place guards against the opposite mistake: implying precision a cost estimate doesn't have.
    What settled it
    The amount on a card and the quote beneath it should say the same thing; a rounding rule that changes the visible figure is the same defect as a wrong quote, just on the other side of the receipt.

    fix no.: df8eea27

  2. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The same rounding defect (see the entry above) also lived in two more places, both live on today's data: the summary sentence on /nie-wyszlo (and /en/failed), and the catalog header under the “failed” filter - the second of those through its OWN, independent copy of the same rounding formula, not a call into the shared, already-fixed function. The prior commit's own adversarial review found both, independently of the panel.
    Is now
    /nie-wyszlo got the same optional flag as the record card, turned on only for loss sums, not cost sums. The catalog got the same conditional logic added locally to its own copy of the formula, rather than (for now) merging the two copies into one.
    What settled it
    One figure cannot carry two different renderings on two pages of the same site; the second copy of the formula carries the same defect until it gets the same fix.

    fix no.: bcf66d18

  3. Central Communication Port Programme (CPK Multi-Year Programme 2024–2032)error in the record datacaught by: the review panel
    Was
    The outcome.schedule field (value “delayed”) rested solely on a Wikipedia quote, the only place in the record that directly pairs the original year (2027) with the current one (2032) in one sentence. Three panel judges independently flagged this as an axis that shouldn't stand on Wikipedia alone.
    Is now
    A second, non-Wikipedia quote from PAP Biznes (“the new schedule provides for...”) was added - the same quote already stood in the record under timeline.planned_end_current. The original Wikipedia quote stayed, since it's the only place with the concrete year 2027; five other sources already in the record were checked and none states that year outright.
    What settled it
    An axis shouldn't rest solely on Wikipedia when the record already carries a quote from another source for the same point; adding a citation rather than swapping one keeps the only concrete year the record has.

    fix no.: df8eea27

  4. the site as a wholeerror in the record datacaught by: the review panel
    Was
    Eight pairs from the panel's random sample (seed 201) rested on quotes that did not state the card's value, or had none. Gdynia breakwaters: stage “permits” on a future-tense announcement of construction works. Poznań clinical hospital: location with no city name in the quote. Warsaw Hub: location via a roundabout, with no city or voivodeship. Łagisza: the main member of the investor's name (“TAURON Wytwarzanie S.A.”) with no quote at all. Ostrołęka C: status “cancelled” on a sentence about suspended financing, not about abandoning construction. WWE Targówek: the name member “Rozbudowa” (expansion) with no quote. Tram to Wilanów: the original deadline “Jun 2024” on a source giving “the first half of 2024”, with no explanation of the month. PKM: the member “a company set up by the Pomeranian voivodeship's local government” on a sentence about the scale of the local government's investment, not about founding the company.
    Is now
    Gdynia breakwaters: a sentence on the water-law permit issued in January 2026 and the building-permit application filed since. Poznań clinical hospital: the quote extended to the sentence naming the City of Poznań. Warsaw Hub: a sentence carrying the investment’s name, which includes “Warsaw” (the previous quote located it only by a roundabout, with no city name at all). Łagisza: a sentence on TAURON Wytwarzanie S.A. as the unit's operator. Ostrołęka C: a sentence on the decision to abandon the coal unit and Enea's full withdrawal. WWE Targówek: a sentence on the contract for the incinerator's expansion. Tram to Wilanów: a note explaining that a deadline given as a period is read on the card as its last month. PKM: a sentence from the company's own site that the Pomeranian voivodeship's local government founded it on 11 June 2010.
    What settled it
    The card's value and the quote beneath it should say the same thing; a sentence about investment scale or a future announcement does not state the stage, status or corporate founding that the card prints.

    fix no.: f3865f5d

  5. the site as a wholeerror in the record datacaught by: the source review
    Was
    On ten cards the receipt for a field was the page title, which appears more than once in the visible text (heading and breadcrumbs) and is not a sentence of the body: A1 Stryków – Tuszyn (status), PepsiCo Święte (stage), Data4 Jawczyce (stage), WISŁA programme (stage), Żelazny Most (stage), Płock CCGT (stage and utilisation), F-35 base at Świdwin (location), Martwa Wisła terminal (status and stage), Północ power plant (stage: the title “without a building permit” under the stage “permits”), Hydrogen Eagle (funding).
    Is now
    Under each of those fields stands a sentence from the body of the same page that states the card's value: the opening of the A1 section, the plant opened on 31 May, the first campus building delivered in 2023, the 37th Squadron's full operational capability as the completion of the first phase of the WISŁA programme, the completed expansion of Żelazny Most, the completion protocol of the Płock unit (beside it, under stage and utilisation, now also stands the sentence on handover to commercial operation, so far only under status, and the block's member on the forecast of about 7 TWh got a sentence of its own, which it lacked), the West Pomeranian voivodeship, the first commercial transhipment on 15 July, the building permit of March 2015 annulled in December 2015, PLN 1.7 billion from the National Recovery Plan (KPO) for the Green H2 and Hydrogen Eagle programmes.
    What settled it
    A receipt should be a sentence of the body that appears once on the page and states the value; a page title carries no date or scope and can contradict the field.

    fix no.: 11818ef2

  6. Sinfonia Varsovia Centrum - new headquarters and the largest concert hall in Polanderror in the record datacaught by: the review panel
    Was
    Stage “construction”, resting on a sentence about the schedule of the first-stage contract (city release of April 2023: “Realizacja inwestycji zajmie zgodnie z umową 24 miesiące, a oddanie gotowych obiektów zaplanowano na pierwszą połowę 2025 roku”, that is delivery within 24 months, completion in the first half of 2025), while the timeline had said “tender” since May 2025.
    Is now
    Stage “tender”: the concert hall, the main scope, is past a resolved tender (Warbud, city release of 12 August 2026) and before a contract; the first stage (modernisation of three historic buildings) gets scope notes under construction start, the timeline row and the status; the contract-schedule sentence no longer supports the stage and has left the card.
    What settled it
    The card's stage should speak of the main scope and rest on a sentence about the state, not on a contract schedule; the record's own timeline already said so.

    fix no.: b47628a5

  7. the site as a wholeerror in the record datacaught by: the review panel
    Was
    Several values from the panel's random sample (seed 197) rested on quotes that did not state them. BESS Ełk: a “private finance” row on a sentence about who carries out the investment. Inspiro: “35 sześciowagonowych składów Inspiro dostarczonych i eksploatowanych na liniach M1 i M2” (35 six-car Inspiro trainsets delivered and operated on lines M1 and M2) on a sentence about 15 trainsets on M1, period 2026. Wrocław stadium: three Euro 2012 matches and 42,771 seats without a quote under those members, period 2026. Miejska Górka: announcement 2024-09 on an undated wire headline. PGE Narodowy: stage “operational” on a sentence about appointing the operator. KPO C1.1.1: status “in progress” on a forecast. Yamal: the 23 September 1999 delivery date also on “launched in 1999”; Bogdanka IGCC: “cancelled” also on a sentence about frozen works.
    Is now
    BESS Ełk: row removed (the capacity-market row stays). Inspiro: sentences on 20 trainsets on M2, on 35 six-car trainsets and on the last trainset of 27 October 2014; period 2023. Wrocław stadium: sentences on three group-stage matches and on 42,771 seats (league configuration, with a note); period 2022. Miejska Górka: the TAURON release dateline of 24 September 2024 (with a note that the date is the dateline). PGE Narodowy: the sentence on the 29 January 2012 inauguration. KPO: the CPPC release of 7 May 2026 on projects being carried out. Yamal and Bogdanka: the weaker sentences no longer support the value; the golden weld of 23 September 1999 and Enea's 2023 withdrawal remain.
    What settled it
    A value on the card should follow from the quote beneath it; the period of a utilisation block should be the source's year, not the year of reading.

    fix no.: b47628a5

  8. the site as a wholeerror in the record datacaught by: the review panel
    Was
    Several quotes lacked a scope note or a caption: CPK (the 2027 date “for the first stage of our investment”), DCT Gdańsk (the owner “until now”), WOC (forming two units under the programme's stage), Camerimage (the studio cornerstone under the construction start of the whole), Civil Protection Programme (“27 May this year” with no adoption year in the quote; the 2025 in that sentence names the programme’s period).
    Is now
    Scope notes under those quotes (the first stage is the airport; the owner up to the 2019 change, which covers the T1 construction; forming units as the programme's construction stage; the studio cornerstone as the start of the whole) and the caption “year taken from the source's publication date” on the Civil Protection Programme (quote shortened to the part without the programme's period).
    What settled it
    The reader should see what the sentence covers when the card reads it more broadly than its literal scope.

    fix no.: b47628a5

  9. the site as a wholeerror in the record datacaught by: the source review
    Was
    Seven cards gave a slip stored in the data from reading a year-only deadline as June, half a year off from the rest of the service, which since 13 September reads such a deadline as the end of the year: Warszawa Zachodnia 29 months, Warsaw-Radom airport 34, the Poland – Slovakia gas interconnector 14, the Aegis Ashore base in Redzikowo 77, Metro M2 53, the E59 Poznań – Szczecin line 27, S19 Rzeszów – Babica 19.
    Is now
    Slip counted from the end of the year given in the deadline: Warszawa Zachodnia 23 months (quote on the card: “over two years”), Radom 28, interconnector 8, Aegis Ashore 71, Metro M2 47, E59 Poznań – Szczecin 21, S19 13. The figure stays stored in the data, because the card would otherwise count the original date against the current one rather than against delivery.
    What settled it
    One reading of a year-only deadline across the service; two figures from the same dates cannot differ by half a year.

    fix no.: 112f0ed7

  10. the site as a wholeerror in the record datacaught by: the review panel
    Was
    Six values from the panel's random sample (September 2026) did not follow from the quote beneath them. K2PL: a “medium” domestic-share band on a quote estimating about 30% and about 15%. Saule: an investor with the addendum “main shareholder Columbus Energy”, while the quote names Olga Malinkiewicz as the largest shareholder. Lublin airport: “underused” on a forecast alone, and the 471,101 passengers attributed to 2024 instead of 2025. CPK and the Łódź cross-city tunnel: “partially delivered” on one finished element or on a sentence about the drilling plan. The timelines of the 1st Legions Infantry Division and Głogów Głęboki: a “construction” row dated by something the sentence does not give (a delivery date, or the article's date).
    Is now
    K2PL: “low” band. Saule: no addendum. Lublin: “underused” on figures (over 188 thousand passengers in the first year against a 500 thousand forecast; 471,101 in 2025). CPK: “not yet due” on a sentence about the 2032 date; the Łódź tunnel: no delivery assessment (the 2031 date was set after drilling was halted). Two timeline rows removed; the “construction” stage of both cards rests on sentences about ongoing works.
    What settled it
    A value on the card should follow from the quote beneath it, not from our inference; one finished element is not partial delivery of a programme.

    fix no.: 112f0ed7

  11. S17 Expressway Warsaw (Zakręt) – Kurów Zachód (part of the Warsaw – Lublin route)error in the record datacaught by: the source review
    Was
    The S17 Warsaw (Zakręt) – Kurów Zachód card gave delivery in 2020, and the data held a stored 12-month slip. 2020 is when the Lubelska – Kołbiel section opened, the last of the 95.5 km covered by the 2016 plan; the card's name and cost, however, cover the route from the Zakręt junction, and its last 2.5 km (Zakręt – Lubelska) opened to drivers on 22 December 2022. The “completed” status rested on a sentence about the Garwolin – Ryki Północ section opening in July 2019.
    Is now
    Delivery on 22 December 2022, on the GDDKiA project card for the Warszawa Wschód – Lubelska section, with a note that the original 2019 date covered the route without that section. The slip is computed from the dates instead of a stored figure; the timeline has a row for this opening; the sentences about the 2019 and 2020 sections say under the quote what they cover.
    What settled it
    A delivery date should cover what the card names, not what the plan covered. A sentence about one section does not prove the whole route is complete.

    fix no.: 14d70270

  12. Was
    The card gave delivery in 2015 and a “completed” status on the sentence “Project completion date per the annex: 30.06.2015”, that is the annexed settlement date of the EU project, not the road opening. The last section (Tarnów – Dębica) opened to drivers on 30 October 2014, the earlier ones in 2012 and 2013.
    Is now
    Delivery on 30 October 2014 on the GDDKiA release of that day; the annex date stays on the card as the last stated date. The annex sentence no longer proves the status or the delivery date.
    What settled it
    A project settlement plan is not a road's delivery date, even when it appears in the investor's document.

    fix no.: 14d70270

  13. Was
    The stage, the delivery date (October 2018) and the construction start (July 2015) rested on an EU projects database entry, “Project duration 07/2015 - 10/2018”, that is the planned implementation period, and the “completed” status on a sentence about one fragment (Ostrów Mazowiecka – voivodeship border).
    Is now
    Delivery on 19 October 2018, when the last section Wyszków – Poręba opened (GDDKiA project card, TVN Warszawa of that day); the gov.pl card of this investment gives 18 October and that discrepancy is recorded in the evidence. The construction start is empty, because no source on the card speaks of works beginning (contracts were signed in January and February 2016).
    What settled it
    A planned implementation period is neither a start date nor a delivery date. An empty field beats a date taken from a plan.

    fix no.: 14d70270

  14. 460 MW power generating unit (supercritical CFB) at Łagisza Power Stationerror in the record datacaught by: the source review
    Was
    The card gave the unit's handover to operation on 30 June 2009, after Wikipedia. Two sources published on 29 June 2009 say otherwise: wnp.pl reports a handover protocol signed on 27 June, PAP a unit already formally handed over.
    Is now
    Delivery on 27 June 2009 on the wnp.pl sentence; Wikipedia's date stays in the evidence as a discrepancy, and the quotes that give it carry a note. The card's description and its utilisation line give the same date.
    What settled it
    Press from the day of the handover beats an encyclopaedia written later, and a card cannot give two dates for the same event.

    fix no.: 14d70270

  15. Visbreaking unit at the Płock production facilityerror in the record datacaught by: the source review
    Was
    The Płock Visbreaking card rested its “completed” status, “operational” stage and 2025 delivery year on one sentence from ORLEN's Q3 2025 quarterly report, and the link led to a reports index where that sentence does not appear. The sentence says the unit was running by the end of September 2025, not when it started, so the delivery year was an inference. The independent-source count took the party from the address, so a company document published by a wire would have counted as a separate voice.
    Is now
    The link leads to the Q3 2025 report PDF in PAP's report archive (p. 54), the same file ORLEN publishes itself. The 2025 delivery year now rests on two ORLEN documents: the Q4 2024 report (p. 17) lists the unit among those under construction in 2024, and the Q3 2025 report (p. 54) says it was already running by the end of September 2025; under the Q4 2024 quote the card says what exactly it proves. The “second quarter of 2025” forecast from the 2024 management report sits in a note, not in a quote. A reference can now declare whose document it is, and the independent-source count honours that; Visbreaking stays at four.
    What settled it
    A reader should land on the sentence the card quotes, and a year on the card should rest on a document, not a guess. A distribution channel is not a second witness.

    fix no.: a6445125

  16. the site as a wholeerror in how we presented itcaught by: the source review
    Was
    A slip computed from a year-only deadline read that year as January, while the overdue check on the same card read it as December. The gap is eleven months on every such slip: E30 Kraków–Rzeszów showed “about 4 years” instead of 3, S1 Węgierska Górka “about 3 years” instead of 2, the sentence on diverging dates on the Kraków tram (stage III) and WTE Targówek cards gave a year too many, and five cards printed a sentence about dates two or three years apart where the consistent reading falls under two years and the sentence goes (Siekierkowski bridge, E59 Poznań–Szczecin, NFM Wrocław, 213 trams for Warsaw, S19 Rzeszów–Babica).
    Is now
    A year-only date reads as the end of that year everywhere, and delivery within the planned year is zero slip. One card, EFRA, now shows more than before (“about 2 years” instead of “under a year”), because a bare year on the delivery side is now its December, an upper bound; the card's own schedule quote puts readiness for start-up at 30 June 2019, so the true slip is about 15 months and neither reading gives it. The card marks such a figure as given as a year.
    What settled it
    Two figures from the same dates on one card cannot differ by a year. A deadline of “by the end of 2023” means December, not January.

    fix no.: eb31427a

  17. the site as a wholeerror in the record datacaught by: the source review
    Was
    Three entries in the data: the delivery date of the Northvolt plant in Gdańsk, cut on 12 September to the bare year 2023 although the source gives May (“put into use in May this year”); the publication date of the article on the Martwa Wisła terminal recorded as June 2026 when the article on a 15 July event appeared on 22 July; the date of the WB Group release on the Warmate programme recorded as May 2026 when it appeared on 1 June.
    Is now
    Northvolt: delivery in May 2023, marked as taking its year from the source's publication date. Martwa Wisła: publication date 22 July 2026. Warmate: 1 June 2026, the same date as on the two other cards citing that release.
    What settled it
    Two publication dates were untrue, and from this change on the card prints them next to the quote; the review of the change found them. The Northvolt date returns to month precision because it was cut for exactly the reason the card can now state.

    fix no.: 7a548044

  18. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    Under a date on the card stood a quote giving the day and month but not the year, because the year sat in the article dateline (“on Tuesday, 15 July”). The card did not say where the year came from, and a reader checking the quote saw an uncovered date. The correction of 12 September promised the date would rest on the sentence that states it; in 56 quotes the sentence states it without the year.
    Is now
    Under such a quote the card says “year taken from the source's publication date” and gives that date; /api/evidence.json carries the same flag. 56 quotes were marked, after checking that the month in the quote is the value's month and the source is dated in that year. The rule of 12 September stands for the day and month; the year alone may come from the publication date when the card says so. Quotes that do not state the value's year and were not marked (110 on 13 September, 104 of them with no month at all) remain debt; a forecast quote is not marked either.
    What settled it
    Taking the year from the dateline is ordinary practice in Polish press and is not guesswork, but the reader should see it rather than infer it.

    fix no.: 7a548044

  19. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 58 cards the quote under a date did not state it the way the card prints it. The year stood only in the article dateline ("on 1 May this year commercial transmission started"), and sometimes the quote was about signing a contract or about a plan rather than the event.
    Is now
    70 quotes are now a sentence that states the event with its date, from the same page or another reference of the record; 76 old ones left the source list. Three dates were lowered to month precision because the sentence gives only the month: Stalowa Wola (September 2020), the W-Z tram route in Łódź (October 2015) and the Pomeranian Metropolitan Railway (September 2015); the card text and the stage history now say the same. At Bogdanka the "announced" stage is September 2018, when the project was presented publicly, not the February 2019 intergovernmental memorandum.
    What settled it
    A date on a card has to rest on a sentence that states it, not on the article’s publication date.

    fix no.: 500d15d

  20. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 29 cards the receipt under "Investor" was a bare name or a sentence in which that entity has another role: contractor, operator or shareholder. Some names came from a page footer or header.
    Is now
    30 quotes are now the row label next to the name on the same page ("Inwestor:", "Zamawiający:", on the EU Grants Map "nazwa beneficjenta") or a sentence stating the role, such as "the beneficiary of the funds … is the Warsaw Municipal Water Supply and Sewerage Company".
    What settled it
    A bare name does not say that the entity is the investor; only a row label or a role sentence does.

    fix no.: 500d15d

  21. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 13 cards a status, stage, cost or delivery receipt was about something else than the card prints: a bare dateline date, a programme name, a contract signing, or the start of service with three of twenty trains.
    Is now
    15 quotes are now a sentence about what the card shows: the opening of a road, works under way, the acceptance of all twenty trains, the cost of the border barrier (1,615 million zloty) or a postponed bid deadline.
    What settled it
    A receipt attests a row of the card, so it has to be about what that row shows.

    fix no.: 500d15d

  22. Expansion of the Wierzchowice Underground Gas Storage Facility to 2.1 billion m3error in the record datacaught by: the source review
    Was
    The card for the Wierzchowice gas storage expansion printed "Current date: 2026" on a 2023 sentence stating the original plan ("at the turn of 2025 and 2026").
    Is now
    The current-date row is gone, because no reference states it with a year in the text. The original date (2026) stays.
    What settled it
    A current date has to rest on a sentence about today’s deadline, not on an announcement made as work began.

    fix no.: 500d15d

  23. the site as a wholeerror in how we presented itcaught by: the source review
    Was
    The Funding line printed free text with no quote behind it, while the source list showed quotes under the same label about sources the line did not name. On 39 cards without a cost figure there was no line at all, although funding receipts were listed.
    Is now
    The line names the types of source (state funds, EU funds, local government, state special fund, multilateral development bank, capacity market and others), each with a quote behind it, also on cards without a cost figure. When every item is intended rather than paid, the line says "planned funding", and a guarantee (such as the government one for Pendolino) is not an item. The old text stays in /api/projekty.json and is printed only where a record has no source types and the text has a quote.
    What settled it
    A receipt is meant to attest what the card shows, and the free text had no quote.

    fix no.: a3d10a8

  24. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 47 cards the funding line named a source that no sentence in the record’s references links to the project, 55 items in all: the National Road Fund on roads where it rested on our inference or on a sentence about all road investments, 20% own funds on Bałtyk 2 and 3 (our arithmetic from 80% gearing), an application, possibility or intention instead of money granted (Kraków Airport, the north-south HVDC line, KPOSK, Olefins III, Warsaw metro line 3), an EU grant for the Łódź cross-city tunnel that was lost, and PHARE at Czorsztyn, which paid only for a study.
    Is now
    These items are gone from the cards and from funding_sources[]; the claims stay in the evidence layer as unsupported. 15 cards now have no funding line at all.
    What settled it
    A funding source on a card has to rest on a sentence that says who pays for this project.

    fix no.: a3d10a8

  25. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 129 cards a quote under the Funding line did not say who pays for this project: it was a bare programme name or the tail of a table row, an amount without a payer, a sentence about another project or a whole programme, or an application instead of a grant.
    Is now
    93 quotes were replaced by a sentence naming the payer and the project, from the same page or another reference of the record, two were added, and 69 left the source list because the item already has such a sentence or is gone from the card.
    What settled it
    The quote under a source type has to say that this payer funds this project.

    fix no.: a3d10a8

  26. the site as a wholeerror in the record datacaught by: the source review
    Was
    Several funding items had a type their quote contradicts: the EIB loan at Stalowa Wola as EU funds, PFR at Jaworzno III and the T5 terminal and the State Treasury at CPK as other sources, shares taken up by the State Treasury at EFRA as a state fund, a special-zone tax relief at the Mercedes plant as state funds, Dell’s contribution to the Łódź plant as private funding on a sentence about the state share; the EIB loan at GIPL sat under own funds, and the rest of the Oder 2006 funding was one item made of two rows of the act table.
    Is now
    The types match the quotes: multilateral development bank, state development bank or fund, state funds, other sources for the tax relief, the investor’s own funds for Dell (the Commission decision on the beneficiary’s own contribution); GIPL has a separate EIB loan item and Oder 2006 two items (the national and regional environmental funds, and municipalities with private sources).
    What settled it
    The source type is what the card prints, so it has to agree with the sentence under it.

    fix no.: a3d10a8

  27. the site as a wholeerror in how we presented itcaught by: the source review
    Was
    The source list printed receipts for fields the card does not show (Baltica 3 under Current date, four receipts on three cards under Cost with no figure), and on closed or cancelled records the date receipt was labelled Current date or Delivery while the row says Last stated date or Ended.
    Is now
    A receipt for a field with no value is not listed, and a date receipt carries the label of its row.
    What settled it
    A receipt attests a row of the card, so it has to carry that row label and value.

    fix no.: a3d10a8

  28. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 153 cards the quotes on the source list did not appear in that wording on the page they point to: 130 differed from the page by a character, a word or a passage left out without an ellipsis, and 117 were not on that page at all or did not say what the field says.
    Is now
    130 quotes now carry the page wording, 68 are another or a longer sentence from the same page, 27 stand once on another reference of the record, and 22 were withdrawn because the page they point to has no sentence saying what the field says. 17 claims were added, 8 of them second fragments of the same page. For 12 quotes from pages behind a bot wall, the reference now carries a Wayback Machine copy that contains the quote.
    What settled it
    A receipt is meant to be a sentence the reader can find on the page it points to.

    fix no.: 005b0b5

  29. the site as a wholeerror in the record datacaught by: the source review
    Was
    Five cards gave a date that no sentence in their sources states: the construction start of the A4 motorway Zgorzelec – Krzyżowa (2007) and of the Wierzchowice gas storage expansion (30 August 2023, a date found only in article headers), the announcement of the Fiat and GM plant in Bielsko-Biała (December 2000, the source gives the founding of the company), the current deadline of the F.E.W. Baltic II wind farm (2032, found only in the page address) and the completion of the Programme for the Oder 2006 (2016, the year from the act, while the programme was abolished from 2015).
    Is now
    These cards no longer give those dates. The description of the Programme for the Oder 2006 says it was to run from 2002 to 2016.
    What settled it
    A date on a card has to rest on a sentence that states it. A page address, an article header or a deadline set in an act does not say when something happened.

    fix no.: 005b0b5

  30. S7 Expressway Gdańsk – Elbląg (Koszwały – Kazimierzowo)error in the record datacaught by: the source review
    Was
    Construction start of the S7 Gdańsk – Elbląg: 9 October 2015, the day the contracts were signed.
    Is now
    Construction start: October 2015, on the sentence that works began in October 2015 and finished on time.
    What settled it
    Signing a contract is not the start of construction.

    fix no.: 005b0b5

  31. Łódź Regional Tramway (ŁTR)error in the record datacaught by: the source review
    Was
    Investor of the Łódź Regional Tram: the City of Łódź (beneficiary) with MPK-Łódź as the operator.
    Is now
    Investor: MPK-Łódź Sp. z o.o. (beneficiary).
    What settled it
    The source names the municipal carrier as the beneficiary that runs the tenders and signs the works contracts.

    fix no.: 005b0b5

  32. Siarzewo Barrage on the Vistulaerror in the record datacaught by: the source review
    Was
    The Siarzewo barrage card counted more than PLN 5 million spent on the environmental procedure as a loss.
    Is now
    The losses axis has no assessment.
    What settled it
    The amount appears only in the article title in the page header, not in its text, and the rest of the article is behind a paywall.

    fix no.: 005b0b5

  33. North–South HVDC direct-current interconnection (PSE)error in the record datacaught by: the source review
    Was
    The description of the north – south direct-current line gave an overhead line of approx. 600 km.
    Is now
    The description gives a length of approx. 700 km and does not say what kind of line it is.
    What settled it
    The sentence about 600 km is not on the page its quote pointed to; the page gives approx. 700 km. No source of the record says what kind of line it is.

    fix no.: 005b0b5

  34. the site as a wholeerror in the record datacaught by: the source review
    Was
    Eight cards gave nine dates that their source does not state as a fact or as a deadline: completion of the Michelin plant investments in Olsztyn (1999, our arithmetic from a three-year programme started in 1996), of the P1 platform (2018, on an announcement of a pilot), of the Szczecin water treatment plants (2010, a deadline from an annex) and of the Warsaw – Łódź line (2018, on a plan); the current deadline of Aegis Ashore and HIMARS (2024, on sentences about an opening and a delivery) and of Rail Baltica (2030, an average of two sources); and both deadlines of the Zwartowo solar farm (September 2022, on a sentence about its opening).
    Is now
    These cards no longer give those dates. The Zwartowo farm is no longer assessed as delivered on time, and Rail Baltica no longer shows a number of months of delay, because the two dates it was computed from are gone.
    What settled it
    A date on a card has to rest on a sentence that states it. A plan, an opening, a delivery or our own arithmetic is not the same as completion or a current deadline.

    fix no.: 2f9c4b2

  35. Completion and expansion of Warsaw metro line II (eastern-northern and western sections)error in the record datacaught by: the source review
    Was
    The M2 metro card named the investor as the City of Warsaw on a bare name that appears neither on the page nor in its archive copy.
    Is now
    Investor: Metro Warszawskie, on the sentence that Metro Warszawskie, as the investor, has two more months to accept the works.
    What settled it
    The source names the company Metro Warszawskie as the investor.

    fix no.: 2f9c4b2

  36. the site as a wholeerror in how we presented itcaught by: the source review
    Was
    On 180 cards the source list printed sentences about the contractor or the place of production under the label “Domestic share”, although the card shows the domestic share in no row.
    Is now
    The source list no longer prints them. The claims stay in /api/evidence.json, and the share band in the API field.
    What settled it
    The domestic share band is our estimate from the contractor’s name, and a receipt on the source list is meant to attest what the card shows.

    fix no.: 2f9c4b2

  37. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 15 cards 17 values (15 dates and two statuses) rested on a sentence about another event or on no event at all, and 45 quotes were a bare date, amount or name taken out of a sentence or a table.
    Is now
    Those values rest on a sentence from the page that states the event, and the short quotes carry the whole sentence or the label from the table row.
    What settled it
    A bare number does not say what it refers to, and a date or status without its event does not attest the label it stands under on the card.

    fix no.: 2f9c4b2

  38. the site as a wholeerror in the record datacaught by: the source review
    Was
    Next to the cost, 171 cards said “<year> prices”, and the source list printed under “Cost” a sentence about the date of the contract, the opening or the figure itself (e.g. that the factory opened on 20 November 2007). The home page counted these records as having “a stated price year”.
    Is now
    A price year stands only on the Oder 2006 programme, whose source gives 2001 prices. The other cards say “data from <year>”, and the share of GDP uses the year the figure comes from, or for an amount converted from a foreign currency the year of the exchange rate; for 163 of the 171 records that is the same year as before.
    What settled it
    A price year is the year in whose prices an amount is expressed. The sources did not give one, and we had been filling in a date from the same sentence.

    fix no.: c070334

  39. the site as a wholeerror in the record datacaught by: the source review
    Was
    171 quotes could not be found on their page character for character: 58 differed in a quotation mark, an apostrophe or a capital letter, and 113 were stitched together with an ellipsis from fragments of the same page. For Dolna Odra the stitching suggested that PLN 1.52 billion was part of PLN 4.73 billion, while the source counts it against the PLN 3.7 billion construction contract.
    Is now
    The quotes follow the page: one continuous fragment or separate fragments, each appearing once. 29 were withdrawn because the fragment carrying the field is not on the page or appears several times; 24 fields got a new sentence from the record’s sources, and four values were removed (the FlyEye stage, the GAZ-SYSTEM programme’s domestic share and two National Road Fund funding sources).
    What settled it
    A quote has to be findable on the page character for character. An ellipsis made it possible to stitch together a sentence the source did not write.

    fix no.: c070334

  40. the site as a wholeerror in the record datacaught by: the source review
    Was
    On 27 cards “Construction start” rested on a sentence about another event (an equipment delivery, a concession, a company’s founding, the choice of a contractor, a programme’s adoption, the first cargo handled, a foundation-stone ceremony while works were already under way), on a plan, or on a record that does not appear on the page.
    Is now
    These cards give no construction start. On more than ten others the date rests on a sentence with the event label from the page (e.g. “Rozpoczęcie budowy 31 marca 1982”), and Bałtyk 2 and 3 on Polenergia’s sentence that the investment decision starts the construction phase.
    What settled it
    Construction start is the start of works or delivery. A delivery, a concession or a programme’s adoption are other events, and a plan does not say what happened.

    fix no.: 3f9a4c7

  41. the site as a wholeerror in the record datacaught by: the source review
    Was
    Under the status or stage of six cards stood sentences about an earlier state, e.g. that the visbreaking unit was still being built next to a status of completed, or that construction was under way at an airport in commissioning.
    Is now
    Those sentences no longer stand under the current status and stage.
    What settled it
    A sentence about the state of things months ago does not attest what the card shows today.

    fix no.: 3f9a4c7

  42. Saule Technologies (commercialization of perovskite solar cells)error in the record datacaught by: the source review
    Was
    Under the status “cancelled”, the Saule Technologies card quoted sentences about the shares being delisted and the company being on the brink of bankruptcy.
    Is now
    The status rests on the enerad.pl sentence that the new management closed the factory and is preparing to sell the company.
    What settled it
    The state of a company and its shares is not the fate of the project.

    fix no.: 3f9a4c7

  43. the site as a wholeerror in how we presented itcaught by: the source review
    Was
    On four cards the outcome section heading printed an assessment (“provisional”, “settled”), while the quote under it had dropped off the source list after the 11 September fix.
    Is now
    The quote stands on the source list under “Assessment”.
    What settled it
    The filter meant to remove receipts for axes the card does not show also removed the receipt for an assessment the card does show.

    fix no.: 3f9a4c7

  44. Modernisation of railway line E65 (C-E65), Warsaw – Gdynia section (LK9)error in the record datacaught by: the source review
    Was
    The card for the E65 Warsaw – Gdynia line upgrade gave “Construction start 2011” and “Delivery 2015” on the record “Implementation Period: 2011 - 2015”.
    Is now
    The card gives no start or delivery date.
    What settled it
    That record does not appear on the PLK page it pointed to.

    fix no.: 3f9a4c7

  45. A1 motorway Toruń–Stryków (GDDKiA's central section, POIiŚ)error in the record datacaught by: the source review
    Was
    The card for the A1 Kowal – Stryków sections gave “Construction start 2010”, “Original date 2012” and “2010 prices” on the bare years “2010–2012” from a table.
    Is now
    The card gives none of these dates and no price year.
    What settled it
    Those years appear four times in the table, and the record alone does not say which section or what they refer to.

    fix no.: 3f9a4c7

  46. National Municipal Wastewater Treatment Programme (KPOŚK)error in the record datacaught by: the source review
    Was
    The KPOŚK card gave “Construction start 16 Dec 2003”, the day the Council of Ministers approved the programme.
    Is now
    Start: 2003, on the sentence about the programme’s tasks carried out in 2003–2020.
    What settled it
    Approving a programme is not the start of delivery, and that day already stands under the announcement.

    fix no.: 3f9a4c7

  47. Was
    The card for the e-Podatki / e-Deklaracje (e-Taxes / e-Declarations) programme said “Announced 2007”.
    Is now
    The card gives no announcement date for the programme.
    What settled it
    2007 rested on a sentence in the Ministry of Digital Affairs summary giving the combined value of seven IT projects carried out by the Ministry of Finance in 2007–2015. That is the implementation period, not an announcement, and none of the record’s sources says when the programme was announced, so we do not guess the date.

    fix no.: 7f4268c

  48. pl.ID - the Polish ID Card (electronic identity document)error in the record datacaught by: the source review
    Was
    The pl.ID programme card said “Announced 2008” and “Construction start 2009”.
    Is now
    The card says “Construction start 2008” and gives no announcement date.
    What settled it
    Both dates rested on one Spider’s Web sentence saying the interior and regional development ministries concluded an agreement in 2008–2009. The sentence is about an agreement, not an announcement or the start of work, and we picked the years from that range ourselves. The start year comes from an interior ministry statement describing the e-ID as the continuation of the failed pl.ID project launched in 2008. None of the record’s sources gives an announcement date.

    fix no.: 7f4268c

  49. New District Hospital in Nysa (outside the flood zone)error in the record datacaught by: the source review
    Was
    The card for the new hospital in Nysa gave the investor as “Powiat Nyski (Zespół Opieki Zdrowotnej w Nysie); dofinansowanie: Ministerstwo Zdrowia”.
    Is now
    The card gives the investor as “Powiat Nyski; dofinansowanie: Ministerstwo Zdrowia”.
    What settled it
    The record’s sources mention the Nysa health-care unit (Zespół Opieki Zdrowotnej) only as the existing hospital, whose main building the flood damaged, and none names it as the investor in the new hospital, so we removed that part. The county as investor rests on an Alert Medyczny sentence, and the Ministry of Health’s share on the county office’s statement that the ministry secured 500 million złoty for rebuilding the hospital in a new location.

    fix no.: 7f4268c

  50. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    Next to the investor the card said “state-owned enterprise” for subsidiaries (Elektrownia Ostrołęka, ORLEN Group companies) and for listed companies with a state stake (KGHM) alike, and “ministry” for GDDKiA, medical universities and museums.
    Is now
    The labels are “state-controlled company” and “state institution”.
    What settled it
    The Polish label, “spółka Skarbu Państwa”, was false for subsidiaries, where the State Treasury holds no shares (the parent does), and misleading for listed companies, where it holds only part of them; the English label changed with it. “Ministry” described only part of the institutions under it.

    fix no.: b5e7bea

  51. the site as a wholeerror in the record datacaught by: the review panel
    Was
    Institutions that are not companies (RZGW Wrocław, NCBJ, NIO, NASK, Polish Waters, the Białystok university hospital, and GDDKiA on one card) were typed as state-owned enterprises, and so were the municipal and metropolitan companies (the Warsaw metro and tram companies, Tramwaje Śląskie).
    Is now
    The institutions on that list are state institutions, and municipal and metropolitan companies are labelled “local government”.
    What settled it
    None of them is a company owned by the State Treasury: they are research institutes, Polish Waters and its regional boards, a university hospital and GDDKiA, while the metro and tram companies belong to a city or to the metropolitan union.

    fix no.: b5e7bea

  52. the site as a wholeerror in how we presented itcaught by: the source review
    Was
    On the source list, field chips (e.g. “Construction start”, “Status”, “Cost”) also stood on sources with no confirmed quote under that field; the chip came from a declaration, not a quote. On 16 cards quotes also stood under “Utilisation” and “Budget” (alone or next to other fields), although the card drew no such row (e.g. “Utilisation” above Intel’s sentence about abandoning the plant).
    Is now
    A chip appears only above a confirmed quote from that source and carries the quote’s label. A quote under an outcome axis appears on the source list only for an axis the card shows.
    What settled it
    A chip reads as a receipt. Without a quote the card said a source attested something it could not show, and a quote under an axis with no row attested an assessment the card does not make.

    fix no.: b5e7bea

  53. the site as a wholeerror in the record datacaught by: the review panel
    Was
    The row “Scope: as announced” stood on 48 cards, among them on sentences that described the delivered scope (“the solar farm has a capacity of 204 MWp”), a cost, a plan (“the barrier will be over 186 km long”), or were an article headline (“Grand opening of the Museum of Modern Art in Warsaw”).
    Is now
    The row stands on six cards, on sentences about the whole, about everything that was planned, or about the last section opened (among them MikroSAR, DK18, metro line M1). It is gone from the other 42.
    What settled it
    Matching the announcement is a comparison, and none of those sentences makes it; by showing the row we were drawing the conclusion for the source.

    fix no.: b5e7bea

  54. the site as a wholeerror in the record datacaught by: the review panel
    Was
    On 41 cards the source list printed, under the label “Losses” (alone or next to other fields), a sentence meant to attest that no losses were known, although it was about something else: the operator of the National Stadium, the European Commission approving state aid for Intel, contractual penalties at the Museum of Modern Art.
    Is now
    None of those sentences stands under “Losses”. The card did not show a losses row when nothing was established, and it still does not.
    What settled it
    The absence of findings about losses is not a claim one sentence can confirm, and none of those sentences said there were no losses.

    fix no.: b5e7bea

  55. Museum of Modern Art in Warsaw – new headquarterserror in the record datacaught by: the review panel
    Was
    The card for the new Museum of Modern Art building gave “Original date 2024” and a slip of “under a year”, although the same description cites the Supreme Audit Office’s finding of years of delay.
    Is now
    The card gives no original date and no slip.
    What settled it
    The original and current dates rested on the same sentence from um.warszawa.pl (“will be ready in the second half of 2024”), so the card gave the current date as the original one. The date in the general contractor’s contract, 28 August 2022, is in the Supreme Audit Office statement linked from one of the record’s sources; the record does not store it yet.

    fix no.: b5e7bea

  56. Intel semiconductor assembly and test factory near Wrocław (Miękinia)error in the record datacaught by: the review panel
    Was
    The card for the Intel plant near Wrocław gave “Original date 2027”.
    Is now
    The card gives no date for the plant to start operating.
    What settled it
    The year 2027 came from a sentence about demand Intel expected by 2027, not about when the plant would start; no source in the record gives such a date.

    fix no.: b5e7bea

  57. National Stadium (PGE Narodowy) in Warsawerror in the record datacaught by: the review panel
    Was
    The National Stadium card gave the investor as “State Treasury (operator: PL.2012+ sp. z o.o.)”, a cost marked “2013 prices” resting only on Wikipedia, and under the location a quote that was a leftover of fetching the page rather than its text.
    Is now
    Investor: Narodowe Centrum Sportu sp. z o.o., with PL.2012+ as operator since 2013. The cost is marked “data from 2013” and also rests on PortalSamorzadowy.pl. The location quote is the address as Wikipedia gives it.
    What settled it
    The investor was Narodowe Centrum Sportu, a company set up for that purpose (the venue’s own site). 2013 is the date of the figure, not a price base: PLN 1,976 million is spending across several years.

    fix no.: b5e7bea

  58. Malczyce barrage on the Odererror in the record datacaught by: the review panel
    Was
    The Malczyce barrage card said “funding: state budget (public funds)” and “2018 prices”, and called the investor, RZGW Wrocław, a state-owned enterprise.
    Is now
    Funding: the National Fund for Environmental Protection and Water Management and the state budget (including the Interior Ministry and the Odra 2016 programme). The cost is marked “data from 2018”, and the investor is a state institution.
    What settled it
    The record’s own source says that of PLN 990.992 million spent by June 2018, PLN 735.610 million came from the National Fund and PLN 22.586 million directly from the state budget. The figure of over PLN 1.1 billion is a nominal sum over 1997–2018, not an amount in one year’s prices.

    fix no.: b5e7bea

  59. Was
    The A4 Tarnów – Rzeszów motorway card gave the cost marked “2015 prices”.
    Is now
    The cost is marked “data from 2015”.
    What settled it
    The price year rested on a sentence about the project completion date under an annex, not on a price base.

    fix no.: b5e7bea

  60. Izera / ElectroMobility Poland (Polish electric car)error in the record datacaught by: the review panel
    Was
    Under losses the Izera card quoted a conditional statement by the ElectroMobility Poland vice-president made before the project was closed. Next to the cost it said “net or gross: not recorded”, although the quote under the amount says “net”, and the status rested only on Wikipedia.
    Is now
    The loss rests on the sentence about over PLN 580 million spent in 2018–2023, the cost is marked net, and Interia also confirms the status.
    What settled it
    A conditional sentence says what would happen, not what happened; the amount spent comes from another source in the record. The word “net” was in the quote all along; we had simply not recorded the VAT basis.

    fix no.: b5e7bea

  61. Second nuclear power plant (EJ2, Konin or Bełchatów)error in the record datacaught by: the review panel
    Was
    The card for the second nuclear power plant quoted four sentences attributed to Energetyka24 that do not appear on the page in that wording, and under the Polish page of the Ministry of Energy it showed an English translation.
    Is now
    The quotes follow the pages’ own wording, for example “Resort wskazał cztery preferowane lokalizacje: Bełchatów, Konin, Kozienice i Połaniec.”
    What settled it
    The stored sentences summarised the article rather than reproducing it, and one added a comparison with the 2020 programme update that the article does not make. A quote has to be verbatim so that a reader can find it on the page.

    fix no.: b5e7bea

  62. Ostrołęka C Power Plant (coal unit)error in the record datacaught by: the review panel
    Was
    Under the location, the Ostrołęka C card quoted a sentence about withdrawing from the construction.
    Is now
    The location quote is the sentence about the general contractor for building the unit “w Ostrołęce” (in Ostrołęka).
    What settled it
    A sentence about withdrawing from construction does not say where the unit was to stand; the unit’s name is not a location.

    fix no.: b5e7bea

  63. Completion and expansion of Warsaw metro line II (eastern-northern and western sections)error in the record datacaught by: the review panel
    Was
    Under the location, the card for Warsaw’s second metro line quoted a sentence about cost, and the city budget source had no title.
    Is now
    The location quote is a sentence about the construction of line M2 in Bemowo, and the source is titled “Budżet Warszawy”.
    What settled it
    A sentence about cost does not say anything about the place.

    fix no.: b5e7bea

  64. Was
    The card for the runway and taxiway rebuild at Jasionka said “Construction start Apr 2025” with the stage “construction”, and its change history showed a “stage: construction” event dated April 2025.
    Is now
    The card gives no construction start. The stage is commissioning: the main taxiway works are finished, and system tests and preparations for technical acceptance are under way (August 2026).
    What settled it
    April 2025 rested on a sentence from the airport’s release announcing the Strabag contract (“the investment will be carried out from April 2025 to mid-September 2026”), which is a plan. The airport’s release of 23 October 2025 says the runway works began on 12 June 2025, but no source says when the taxiway works began, so we do not guess the date. The stage now follows TransInfo’s report of 4 August 2026.

    fix no.: c2e1034

  65. Construction of the Olsztyn tram network with a Solaris Tramino fleet (revival of trams)error in the record datacaught by: the source review
    Was
    The Olsztyn tram network card said “Construction start 1 Mar 2012”.
    Is now
    Construction start: 12 September 2012.
    What settled it
    Construction began formally on 1 March 2012. The same Wikipedia quote says the works on the network actually began on 12 September 2012, and that is the date the “Construction start” row now shows.

    fix no.: c2e1034

  66. Northvolt battery systems plant in Gdańsk (Northvolt Dwa)error in the record datacaught by: the review panel
    Was
    The Gdańsk battery factory card said “Delivery 22 Nov 2024”, and its history showed a “cancelled” event on that day.
    Is now
    Delivery: May 2023. The event of 22 November 2024 is a production pause; the plant runs today under a new owner.
    What settled it
    On 22 November 2024 Northvolt announced the end of its operations in Gdańsk; that is a closure date, not a delivery date. The plant was put into service in May 2023 (green-news.pl), which gdansk.pl and Lyten also confirm.

    fix no.: d043f67

  67. Lubiatowo-Kopalino Nuclear Power Plant (EJ1)error in the record datacaught by: the source review
    Was
    The card of the first nuclear power plant said “Construction start Sep 2023”.
    Is now
    The card gives no construction start; the plant is at the permits stage (the construction permit application was filed on 31 March 2026).
    What settled it
    The date rested on the signing of the engineering services contract with Westinghouse and Bechtel, which is not the start of construction.

    fix no.: d043f67

  68. Central Communication Port Programme (CPK Multi-Year Programme 2024–2032)error in the record datacaught by: the review panel
    Was
    The CPK programme card said “Construction start 12 Sep 2018”, and rested its “construction” stage on sentences about works still to begin. The Y line card (kdp-y) gave a start in August 2025.
    Is now
    Neither card gives a start date. The construction stage rests on sentences about ongoing works on the high-speed rail tunnel in Łódź (Ministry of Infrastructure, November 2024; launch chamber completed in 2025).
    What settled it
    12 September 2018 is when the special-purpose company was set up, and August 2025 is when the site was handed to the boring contractor, with the chamber already built. Neither date is the start of construction, and the records do not yet hold a source that dates it.

    fix no.: d043f67

  69. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The outcome label and the marker next to a loss amount said “audit or prosecutor claim” and “(claimed)”, also for Radom airport, where the prosecutor runs an investigation into the matter and nobody has been charged.
    Is now
    The label says “audit finding or investigation”, and the marker next to the amount says “(named by an audit or under investigation)”; the tooltip adds that the label alone does not say whether anyone has been charged.
    What settled it
    In Polish the word used (“zarzut”) means a formal charge against a person, not an audit finding or an investigation into a matter. Judges of the fourteenth panel read it next to Radom as the kind of sentence that gets a lawyer on the phone. In the same pass we corrected the wording of an older entry in this register that used the same word to describe a past error.

    fix no.: 950e786

  70. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The “under way now” counter (87) included announcements with a deadline by 2026, and the “under construction” badge also appeared on tenders, permits and bare announcements.
    Is now
    The counter (85) counts only records at the construction or commissioning stage. The badge takes its word from the stage: “under construction”, “in preparation”, “operating, being expanded”, or “in progress” when no stage is recorded.
    What settled it
    The “in progress” status says the investment is under way, not that anyone is digging. Among the 116 such records are announcements, permits and tenders, so the word “construction” claimed something the sources do not say.

    fix no.: 950e786

  71. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The home page said “~5% of the whole database (21 of 383)” did not work out, and among its five failure examples showed the post-Northvolt factory, which is not on the “Failed” list. Cards of cancelled records called the cancellation date “Delivery”.
    Is now
    The rate is computed over current records that are completed or stopped (14 of 79, about 18%), next to the delays and overruns from the axes shown on cards. The failure examples include the paused cross-city tunnel in Łódź, Żarnowiec (1982–1990) sits among the landmarks, and cancelled and superseded cards say “Ended”.
    What settled it
    The denominator included records under construction or planned, which had not yet had the chance to fail, and landmarks picked from among those still standing. Each of the new figures has a recipe in /api/statystyki.json.

    fix no.: 950e786

  72. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The “Digital” pill covered only six commercial data centres. Eleven state systems, registers and networks sat under “Other”, the P1 platform under Health, and Cyberbezpieczny Samorząd under Defence. The M2 metro line sat under “Other”. Eight waste-to-energy plants stood on the Energy domain page while their own card said “Other”.
    Is now
    A new category, “Digital state”, belongs to the Digital domain (19 records, including CEPiK and P1), the M2 metro line is under Transport, and the waste-to-energy plants carry the same domain on the card, in the catalogue and in the press kit.
    What settled it
    Two judges of the thirteenth panel noticed that the Digital domain was empty exactly where state registers should be. Along the way it turned out that the category-to-domain map had been copied into three files and one copy lacked the waste-to-energy category. There is now one map, checked automatically.

    fix no.: c0b0042

  73. S3 Expressway Nowa Sól – Legnica (Kaźmierzów – Legnica section)error in the record datacaught by: the source review
    Was
    The card said the whole 48 km or so of the S3 Kaźmierzów – Legnica section opened in 2018 and that this completed the S3 route in Lower Silesia. It gave no schedule verdict.
    Is now
    About 34 km opened in 2018, including the link to the A4. The last stretch, Kaźmierzów – Lubin Północ, opened on 10 November 2021, about 35 months late; only then did the S3 run continuously from Szczecin to Bolków.
    What settled it
    The year 2018 rested on a 2018 GDDKiA page that itself says the last section was still to come. The verbatim audit of quotes set it against that section's own page and the report of its 2021 opening.

    fix no.: f8d03a2

  74. S3 Expressway, Gorzów Wielkopolski – Sulechów sectionerror in the record datacaught by: the source review
    Was
    The card said the S3 Gorzów Wielkopolski – Sulechów section completed the S3 expressway through the Lubuskie voivodeship.
    Is now
    The section, opened between May 2013 and May 2014, linked Gorzów and Sulechów by expressway. A continuous S3 in Lubuskie came on 20 December 2018, when the second carriageway between the Niedoradz junction and Nowa Sól opened.
    What settled it
    The same record cites a release from 20 December 2018 saying that it was that opening which completed the S3 in the Lubuskie voivodeship.

    fix no.: f8d03a2

  75. A1 motorway Toruń–Stryków (GDDKiA's central section, POIiŚ)error in the record datacaught by: the source review
    Was
    The card said the delayed, final section of the A1 Toruń – Stryków was Kowal – Sójki, opened on 30 April 2014.
    Is now
    Kowal – Sójki opened on 13 November 2012. The delayed sections were north of Kowal: Czerniewice – Pikutkowo (21 December 2013) and Pikutkowo – Kowal (30 April 2014).
    What settled it
    The same GDDKiA page the record cited dates Kowal – Sójki to 13 November 2012; we had attached the 2014 date to the wrong section.

    fix no.: f8d03a2

  76. Was
    The E20 Sochaczew – Swarzędz card gave a cost of PLN 2.3 billion, a delivery date and scope as announced. Eight claims rested on the poznan-warszawa.pl site, and the “official” link led to that domain.
    Is now
    Budget of PLN 2.2 billion according to the ministry (January 2023), schedule delayed (plan: November 2020, last stated date: Q4 2023), with no delivery date and no scope verdict, because no source in the record gives them. The record has left the GDP-share chart, which skips completed records with no delivery year.
    What settled it
    The poznan-warszawa.pl domain, once PKP PLK's project site, now belongs to a site carrying betting links. Claims resting on it are marked unsupported, and the fields that stood on it now rest on Rynek Kolejowy and Kolejowy Portal.

    fix no.: 928ea69

  77. Water Supply and Wastewater Treatment in Łódź (Cohesion Fund Project 2004-2006)error in the record datacaught by: the source review
    Was
    The Łódź wastewater plant card gave construction dates and a price year, and the GDP-share chart counted it in 2006.
    Is now
    The construction dates and the price year are empty, and the record has left the GDP-share chart.
    What settled it
    The construction dates and the price year rested on the words “perspektywa 2004 - 2006”, the Cohesion Fund programming period; the same year 2004 was also the date of the amount. The project page on Mapa Dotacji gives none of these dates.

    fix no.: 928ea69

  78. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The corrections register ended on a sentence saying every entry points at the commit where the fix landed, “so you can see exactly what changed”, and carried ten links to GitHub.
    Is now
    The commit hash stands as plain text, and the note says plainly that the repository is private and the hash will not open.
    What settled it
    All ten links pointed at github.com/kgluszczyk/megalo, and that repository is private, so every one of them returned a 404 to the reader. We built a promise of verifiability on something the reader cannot verify, on the one page in the service whose job is to earn trust. The hash stays as an identifier for correspondence: you can quote it in a message and get an answer, which a link to a 404 cannot do. The gate now asks every outgoing link on that page for its status code, and separately checks that the note promises no hash you can open.

    fix no.: 7e643bd

  79. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The “What did not work out” table printed “no date” in 18 of 21 rows and showed cost in none of them.
    Is now
    The “Since when” column gives the earliest year the record holds, with a cost column beside it. “no date” is down to 2 rows out of 21.
    What settled it
    The column took the catalogue feed's “opening year”, and that field is empty by construction for anything cancelled or superseded: a project that never started has no opening year. On a page whose whole purpose is to list cancelled projects, that was 18 rows out of 21. The field was not lost, then, but chosen so that on this one page it could never fill. The records carried some date for 19 of 21 and a cost for 12 of 21 throughout, which left Olefiny III, the largest cancelled investment in the database, looking like a trifle with no date and no amount. The data holds no date of failure itself and we do not invent one, so the tooltip says which field the year comes from. The first version of this fix read only two fields and still printed “no date” when both were empty, even where the record's timeline held events from 2024 and 2025; the current one takes the earliest year across everything the record records. The gate's threshold is computed from the API, not picked by hand.

    fix no.: 7e643bd

  80. Warsaw-Radom Airport (expansion of the Radom-Sadków airport)error in the record datacaught by: the review panel
    Was
    Two claims quoted a sentence cut off after the first of five names: “The first spade […] was broken by prime minister Mateusz Morawiecki”.
    Is now
    The quote carries the full list, as the source recorded it, and the retrieval date is the day we checked it again.
    What settled it
    The excerpt was faithful character for character, but the verb stayed plural, so the sentence read as though the prime minister had broken ground alone. The deputy Senate marshal, the MP, the government plenipotentiary for CPK and the head of PPL vanished from it. A judge on the eighth panel pointed this out, and a second judge went further and called the quote fabricated. It was not fabricated, and that is the worst of it: a truncated list looks like fabrication from the outside, and a quote is the only currency this service has. This record is the worked example in llms.txt and on /developers, so it is the one that shows how we handle a quote. The gate now catches a Polish plural verb followed by exactly one name and the end of the sentence.

    fix no.: 7e643bd

  81. "Żarnowiec" Nuclear Power Planterror in how we presented itcaught by: the review panel
    Was
    The catalogue card printed “PLN 2.0 bn lost”, and then for several dozen minutes “PLN 2.0 bn lost USD”.
    Is now
    The card says “USD 500 mn lost”, exactly as the source recorded it.
    What settled it
    The record's loss is USD 500 mn from around 1990. We converted it at the site's fixed rate to PLN 2 bn and showed it next to a 2025 write-off, saying neither that it was a conversion nor from which year. While fixing that, we appended the source's currency code to the converted amount, so the card began printing “PLN 2.0 bn lost USD”: four times the documented figure, in the wrong units. That version was live in production. The record itself stated USD 500 mn correctly throughout; the error was in the catalogue card.

    fix no.: d01da86

  82. the site as a wholeerror in how we presented itcaught by: the review panel
    Was
    The “written off” label promised seven records while four were written off. Under that word stood the working Siekierkowski Bridge and a prosecutor's investigation into Radom airport.
    Is now
    The counter and the filter no longer treat an audit finding or a prosecutor's investigation as a write-off. The project card already drew that distinction; this fix covers the two places where it had not taken hold.
    What settled it
    This was not an imprecision but the kind of sentence that gets a company's lawyer on the phone.

    fix no.: 3c3393d

  83. A2 Motorway (Świecko–Poznań–Łódź–Warsaw section)error in the record datacaught by: the review panel
    Was
    The schedule axis said “on time”.
    Is now
    The axis is no longer shown and the card puts a dash in its place. The claim carries an “unsupported” verdict together with a note on exactly what was checked.
    What settled it
    The only quote under that axis was a GDDKiA statement in the future tense: the sections “will certainly be built before UEFA EURO 2012 starts”. A promise that something will be built ahead of a date is not a settlement that it was. The record has no planned date either, so there was nothing to compare against.

    fix no.: 33e9f7e

  84. the site as a wholeerror in the record datacaught by: the review panel
    Was
    Three quotes printed in quotation marks as verbatim had been stripped of Polish diacritics.
    Is now
    All three restored character for character from archived copies. The remaining suspect quotes are listed as debt rather than corrected from memory.
    What settled it
    Six others turned out to be faithful: the source itself writes without diacritics, so “fixing” them would have falsified the quotation. That is why we touch nothing we cannot confirm at the source.

    fix no.: 5e1dcf9

  85. the site as a wholeerror in how we presented itcaught by: readers
    Was
    Chapter 02 said “66 completed megaprojects” while the filter on the same page showed “Completed 226”. With no word of explanation.
    Is now
    The lead names the era (“66 completed megaprojects of the modern era”), and the chart caption reconciles both figures, saying earlier landmarks are collected selectively.
    What settled it
    Both numbers were true and described different sets. The site knew this in its code and said nothing to the reader, so one screen carried a contradiction.

    fix no.: 3682c30

  86. Veolia Nowa Energia Energy Recovery Plant (ITPO) in Łódź (EC4)error in the record datacaught by: the monthly review
    Was
    Cost of PLN 1,000 mn, flagged as an estimate.
    Is now
    Total cost PLN 1,855.7 mn, from the NFOŚiGW application list.
    What settled it
    Our figure had never been published anywhere. We took it as a lower bound from a headline reading “worth over a billion zloty”, and the record understated the cost by some PLN 856 mn.

    fix no.: f50fc78

  87. Baltica 3 offshore wind farmerror in the record datacaught by: the monthly review
    Was
    A “permits” stage with a 2030 delivery date, that is a project tidied up before construction.
    Is now
    The date is gone and the description rewritten: the project was halted and is undergoing deep economic optimisation, with decisions tied to market and regulatory conditions.
    What settled it
    The year 2030 came from our own reading of “by the end of the decade” in a wire story. No source stated it.

    fix no.: f50fc78

  88. LG Energy Solution Wrocław battery gigafactory (Biskupice Podgórne) – expansionserror in the record datacaught by: the monthly review
    Was
    A “commissioning” stage, that is a plant still starting up.
    Is now
    An “operational” stage. The plant has been in serial production for years, up to a million cells annually, for Volkswagen, Audi, BMW and Porsche.
    What settled it
    Start-up had ended long before our entry was written, and the stage stayed as it was. This entry was added after review: the same monthly pass corrected three records that stated untruths, and the register listed two of them.

    fix no.: f50fc78

  89. Yamal–Europe gas pipeline – Polish section (Line I)error in the record datacaught by: automated data check
    Was
    The owner field held the pre-2023 structure: “Europol Gaz S.A. (a PGNiG/PKN Orlen, Gazprom and Gas-Trading company)”.
    Is now
    As stated by the quote that grounds the field: since 2024 the sole owner of this section is Grupa Orlen.
    What settled it
    The database was showing a Russian state company as a co-owner of Polish strategic gas infrastructure. Of everything in this register, this entry carries the gravest factual error.

    fix no.: f4cfea0

  90. SK Nexilis copper foil factory in Stalowa Wolaerror in the record datacaught by: the source review
    Was
    The record said local June press reported the plant had started production, hedged with “needs confirmation”.
    Is now
    The claim is refuted. The plant was completed in 2025 and its start-up was repeatedly postponed for want of customers.
    What settled it
    One Korean trade outlet writes explicitly about a postponed start, and a second describes preparations ahead of full production. The local press repeated an announcement, not an event.

    fix no.: 97c3546

Entries run newest first. Each has a fix number you can quote when writing to us. The number proves nothing by itself: the proof is what the record card shows and the quote beneath it.