Municipal Waste Thermal Treatment Plant (ZTPOK/ITPOK) in Bydgoszcz
A municipal waste thermal treatment plant in Bydgoszcz, built in an industrial district in the east of the city and operated by the municipal company ProNatura. The plant was one of the first large waste incineration plants in Poland co-financed with European Union funds under the Operational Programme Infrastructure and Environment from the Cohesion Fund. Construction started on 30 September 2013, the official handover took place on 26 November 2015, and on 29 February 2016 the company ProNatura took over the plant for operation. The plant, with a nominal capacity of approximately 180,000 tonnes (Mg) of waste per year, incinerates the residual fraction of municipal waste, producing electricity and district heat. The total project cost under the EU co-financing agreement was approximately PLN 522.6 million, of which approximately PLN 255.8 million was EU support.
How it went
This record carries no outcome assessment on any of the four axes yet. The timeline and sources below show what is known about it; the assessment itself has not been made.
Timeline
- Construction start30 Sep 2013
- Delivery2016
Change history
- 29 Feb 2016status: completed29 lutego 2016 r. spółka ProNatura przejęła ZTPOK do eksploatacji (uroczyste oddanie do użytku 26 listopada 2015 r.).
- 29 Feb 2016stage: operational
- 30 Sep 2013stage: construction
Significance
The plant completes Bydgoszcz's waste management system, providing thermal treatment of the non-recyclable fraction of municipal waste instead of landfilling it, and produces electricity and district heat for the city. It was one of the first large waste incineration plants in Poland built with EU co-financing (Operational Programme Infrastructure and Environment, Cohesion Fund) and processes approximately 180,000 tonnes of waste per year.
Sources 6 · 4 independent · 5 archived
Every fact on this card comes from the sources below. Next to each source – which fields it supports.
Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.
- Wikipedia (pl)2025StatusConstruction startInvestor
StatusUroczyste oddanie spalarni do użytku nastąpiło 26 listopada 2015 roku
Construction startBudowę rozpoczęto 30 września 2013 roku
InvestorSpółką założycielską ZTPOK jest ProNatura z większościowym udziałem miasta Bydgoszczy
- Teraz Środowisko27 Nov 2015
- ProNatura Bydgoszcz26 Feb 2021StageCostDeliveryFunding
Stage · Delivery29 lutego 2016 r. Spółka przejęła do eksploatacji ZTPOK.
CostKoszt Projektu zgodnie z umową o dofinansowanie unijne wyniósł: 522 571 276 zł
Fundingw tym kwota unijnego wsparcia to 255 773 152 zł
- Funding
Funding60% tej kwoty stanowi unijne dofinansowanie, około 38% wynosi preferencyjna pożyczka z NFOŚiGW i WFOŚiGW, pozostałe środki to wkład własny.
- PortalSamorzadowy.pl10 Feb 2021Investor
InvestorSpółką założycielską ZTPOK jest ProNatura z większościowym udziałem miasta Bydgoszczy.
- Portal Komunalny1 Mar 2016StatusStage
Status · StageBydgoska ekoelektrociepłowania wytwarza już energię elektryczną i cieplną z dostarczanych odpadów komunalnych.