← all projects
🚆Transportstrategic

S19 Rzeszów Południe – Babica (TBM tunnel)

under constructionstage: construction
PLN 3.0 billion
programme budget (multi-year) · data from 20 Feb 2026net or gross: not recorded≈ PLN 3.0 billion (value-by-stage, est., nominal)funding: EU funds

Construction of a 10.3 km section of the S19 expressway between the Rzeszów Południe and Babica interchanges, carried out by GDDKiA along the Via Carpatia route. The main structure is a twin-bore tunnel 2,255 m long, bored by the TBM "Karpatka", the first such structure in Podkarpackie Voivodeship. Construction work began in April 2022; after methane was detected in the rock mass, work was suspended and the contractual deadline was moved by an annex from autumn 2026 to 7 January 2028. The first tunnel bore was excavated in December 2025, and boring of the second bore has been underway since June 2026. The planned total cost exceeds PLN 3 billion, with EU funding (FEnIKS) of nearly PLN 1.5 billion.

How it went

We have assessed this project, but none of the four axes is shown here: 2 carry no assessment yet, 2 have an assessment with no confirmed quote. The timeline and sources below show what is known about it. How to read this section

Timeline

  1. Construction startApr 2022
  2. Original date2026
  3. Current date7 Jan 2028

Change history

  • Apr 2022stage: construction

Significance

The section closes the expressway exit from Rzeszów to the south along the international Via Carpatia corridor. The 2,255 m tunnel will be the first structure of its kind in Podkarpackie Voivodeship, and the project, with a planned cost of over PLN 3 billion, is among the most expensive road sections in the region; nearly PLN 1.5 billion comes from EU funds. The methane detected and the associated redesign of the TBM made the project a prominent example of geological risk in Polish road megaprojects, with a two-year deadline shift (from 2026 to 2028).

Sources 6 · 5 independent · 4 archived

Every fact on this card comes from the sources below. Next to each source – which fields it supports.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Podkarpacki Urząd Wojewódzki w Rzeszowie20 Feb 2026
    CostInvestorFunding
    CostPlanowany, całkowity koszt realizacji tego odcinka drogi ekspresowej S19 wynosi ponad 3 mld zł.
    InvestorGDDKiA w Rzeszowie podpisała pierwszą w tym roku umowę o dofinansowanie z Programu Fundusze Europejskie na Infrastrukturę, Klimat, Środowisko (FEnIKS)
    Locationpierwszy taki obiekt w woj. podkarpackim
    FundingKwota wydatków kwalifikowalnych to niemal 1,8 mld zł, a dofinansowanie ze środków UE to prawie 1,5 mld zł.
  2. Ministerstwo Infrastruktury (gov.pl)10 Dec 2025
  3. Generalna Dyrekcja Dróg Krajowych i Autostrad (gov.pl)
  4. Rynek Infrastruktury3 Jun 2025
    Original dateCurrent date
    Original datePoczątkowo założono, że tunel zostanie wykonany w ciągu 54 miesięcy od podpisania umowy z wyłączeniem okresów zimowych. W tym wariancie budowa zakończyłaby się jesienią 2026 roku.
    Current dateZgodnie z zawartym aneksem, termin na ukończenie prac to 7 stycznia 2028 r.
  5. Podkarpacki Urząd Wojewódzki w Rzeszowie13 Feb 2026
    Construction startStage history
    Construction start · Stage historyw kwietniu 2022 r. rozpoczęły się roboty budowlane
  6. Inżynieria.com24 Jun 2026
    StatusStage
    StatusTBM Karpatka rozpoczęła drążenie drugiej, prawej nawy tunelu
    Stagewydrążono około 10 m tunelu właściwego