Field
Transport in Poland
136 strategic investments in this field. In progress: 34, completed: 93. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.
121 of 136 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.
Projects in this field
Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.
- Tram to Mistrzejowice – KST Stage IV (Krakow, PPP)PLN 1.9 billion
- Reconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)PLN 0.11 billion
- Completion and expansion of Warsaw metro line II (eastern-northern and western sections)PLN 10 billion
- S10 Expressway Bydgoszcz – ToruńPLN 2.1 billion
- Vistula Spit Canal and Waterway to ElblągPLN 2.0 billion
- Szczecin Metropolitan RailwayPLN 1.4 billion
- Expansion and Modernisation of Poznań-Ławica AirportPLN 1.3 billion
- T5 Terminal at the Port of Gdańsk – offshore wind installation terminalPLN 1.2 billion
- Expansion of Wrocław Airport (Operational Area, Stage I)PLN 0.38 billion
- S7 Warsaw – Gdańsk / Warsaw – Krakow (corridor-closing sections)n/a
- S19 Rzeszów Południe – Babica (TBM tunnel)PLN 3.0 billion
- Expansion of the A2 Motorway Łódź–Warsaw with a Third/Fourth LanePLN 1.5 billion
- Improving access to the Port of Gdańsk – modernization of waterway 2 (4 quays)PLN 0.53 billion
- Gdańsk Airport Investment Programme 2025–2028PLN 0.50 billion
- S17 Expressway Piaski – Hrebenne (border with Ukraine)n/a
- A2 Motorway eastward: Warsaw (Lubelska) – Biała Podlaska – Terespol/KoroszczynPLN 4.6 billion
- CPK Airport / Port Polska (Baranów–Wiskitki–Teresin)PLN 43 billion
- Programme for the Construction of 100 Bypasses for 2020–2030PLN 28 billion
- Podłęże – Piekiełko: 58 km new railway line + modernisation of line 104 Chabówka – Nowy SączPLN 17 billion
- Deepwater Container Terminal in Świnoujście (Przylądek Pomerania)PLN 10 billion
- Outer Port at the Port of Gdynia (deep-water container terminal, PPP)PLN 5.0 billion
- Reconstruction of Warszawa Wschodnia stationPLN 3.6 billion
- Cross-city rail tunnel in Łódź (Łódź Fabryczna – Łódź Kaliska/Żabieniec)PLN 2.3 billion
- Katowice Airport Investment Programme 2024–2032 (new main terminal)PLN 1.8 billion
- Modernization and expansion of Chopin Airport in WarsawPLN 0.94 billion
- Central Communication Port Programme (CPK Multi-Year Programme 2024–2032)PLN 132 billion
- High-Speed Rail "Y": Warsaw – CPK – Łódź – Wrocław/PoznańPLN 80 billion
- S19 Via Carpatia Expressway (Polish section)PLN 27 billion
- S61 Via Baltica expresswayPLN 11 billion
- A1 motorway Toruń–Stryków (GDDKiA's central section, POIiŚ)PLN 5.7 billion
- A4 Motorway Tarnów (Krzyż interchange) – Rzeszów (Rzeszów Wschód interchange), including a section of the S19 expressway (Rzeszów Zachód interchange – Świlcza interchange)PLN 5.3 billion
- S8 Expressway, Walichnowy interchange – Łódź (A1) section (Wrocław – Łódź direction)PLN 5.1 billion
- Modernisation of railway line E30/C-E30 Kraków – Rzeszów (Podłęże – Rzeszów section, stage III)PLN 4.7 billion
- Warsaw Southern Bypass S2 with the tunnel under UrsynówPLN 4.6 billion
- Expansion of Kraków Airport (New Investment Plan: Terminal Stage I + New Runway)PLN 4.2 billion
- Warsaw Metro Line 2 (M2) – Central Section (Rondo Daszyńskiego – Dworzec Wileński)PLN 4.2 billion
- Wrocław Motorway Bypass A8 (including the Rędzin Bridge over the Oder)PLN 4.0 billion
- S17 Expressway Warsaw (Zakręt) – Kurów Zachód (part of the Warsaw – Lublin route)PLN 4.0 billion
- Modernization of the E59 line Poznań Główny – Szczecin DąbiePLN 4.0 billion
- A1 Motorway Tuszyn–Częstochowa (completion of the A1)PLN 3.7 billion
- S7 Expressway Gdańsk – Elbląg (Koszwały – Kazimierzowo)PLN 3.2 billion
- Modernisation of railway line E65 (C-E65), Warsaw – Gdynia section (LK9)PLN 3.2 billion
- A1 Motorway Gdańsk–Toruń (Gdańsk Transport Company concession section)PLN 3.1 billion
- A1 motorway Częstochowa – PyrzowicePLN 3.0 billion
- S6 completion: Koszalin – Słupsk – Bożepole WielkiePLN 2.9 billion
- Tri-City Metropolitan Ring Road (S6)PLN 2.9 billion
- Purchase of Pendolino ED250 trains (PKP Intercity)PLN 2.6 billion
- Reconstruction of Warszawa Zachodnia StationPLN 2.6 billion
- S7 Naprawa – Skomielna Biała section with the tunnel under Luboń Mały (Zakopianka)PLN 2.5 billion
- S5 Expressway Poznań – WrocławPLN 2.4 billion
- S3 Expressway Szczecin – Gorzów WielkopolskiPLN 2.3 billion
- A1 motorway Sośnica (Gliwice) – Gorzyczki (the Silesian A1 section, via Świerklany)PLN 2.2 billion
- Works on railway line E20 on the Warsaw – Poznań section, remaining works, Sochaczew – Swarzędz section (second modernisation of E20)PLN 2.2 billion
- S8 Expressway Konotopa – Powązkowska (Trasa Armii Krajowej, Warsaw)PLN 2.1 billion
- S3 Expressway, Gorzów Wielkopolski – Sulechów sectionPLN 2.1 billion
- Baltic Hub T3 – the third deep-water container terminal in GdańskPLN 2.0 billion
- Modernization of the E30 railway line Katowice – KrakowPLN 2.0 billion
- S3 Expressway Nowa Sól – Legnica (Kaźmierzów – Legnica section)PLN 2.0 billion
- Modernization of the Świnoujście–Szczecin fairway to 12.5 mPLN 2.0 billion
- Modernisation of railway line no. 8, Warszawa Okęcie – Radom section (LOT A-F)PLN 1.9 billion
- Purchase of up to 213 trams for Tramwaje Warszawskie (Hyundai Rotem contract, 2019)PLN 1.8 billion
- A1 motorway Toruń Południe – Kowal (Czerniewice–Kowal section, part of the A1 Toruń–Stryków build)PLN 1.8 billion
- A4 Motorway Jarosław – Korczowa (Ukrainian border)PLN 1.8 billion
- S3 Bolków – Kamienna Góra with the TS-26 tunnel (S3 Legnica–Lubawka)PLN 1.8 billion
- New Łódź Fabryczna Station (with multimodal hub)PLN 1.8 billion
- Modernisation of railway line E59, Wrocław – Poznań section (line no. 271)PLN 1.7 billion
- Siekierkowski Bridge and Siekierkowska Route in WarsawPLN 1.6 billion
- Purchase of 20 Stadler/Newag FLIRT (ED160) electric multiple units for PKP IntercityPLN 1.6 billion
- S7 Expressway – Southern Gdańsk Bypass (Straszyn – Koszwały)PLN 1.6 billion
- Integrated Project for the modernisation and development of tram infrastructure in the Śląsko-Zagłębiowska Agglomeration, together with the purchase of tram rolling stock (POIiŚ 2014-2020)PLN 1.6 billion
- A1 motorway Pyrzowice – Piekary ŚląskiePLN 1.5 billion
- Purchase of 186 PESA 120Na Swing trams for Tramwaje WarszawskiePLN 1.5 billion
- S1 Węgierska Górka bypass (Przybędza – Milówka)PLN 1.4 billion
- Construction of the S3 Expressway Gorzów Wielkopolski – Nowa Sól, Sulechów (Kruszyna interchange) – Nowa Sól section (second carriageway of the S3 and second carriageways of the Gorzów Wielkopolski and Międzyrzecz bypasses)PLN 1.3 billion
- Purchase of 20 Pesa Dart ED161 electric multiple units for PKP IntercityPLN 1.3 billion
- Deepening of the approach fairway and internal basins of the Port of Gdynia to 16 mPLN 1.3 billion
- S69 Expressway (now S1) Bielsko-Biała – Żywiec – ZwardońPLN 1.2 billion
- S8 Expressway Wyszków – Mazowieckie/Podlaskie voivodeship border (Warsaw – Białystok direction)PLN 1.2 billion
- Maria Skłodowska-Curie Bridge (North Bridge) in Warsaw with the North Bridge RoutePLN 1.2 billion
- A4 Motorway Zgorzelec – KrzyżowaPLN 1.1 billion
- Modernisation of railway line E20, Siedlce – Terespol sectionPLN 1.1 billion
- A1 motorway Świerklany – Gorzyczki (Czech border, the Mszana bridge)PLN 1.1 billion
- Purchase of 35 Siemens Inspiro trains for the Warsaw MetroPLN 1.1 billion
- A1 motorway Stryków (Łódź Północ) – Tuszyn (eastern Łódź bypass)PLN 1.0 billion
- Protective breakwater for the external port in Świnoujście (LNG terminal shelter)PLN 1.0 billion
- A4 Motorway Rzeszów Wschód – Jarosław ZachódPLN 0.99 billion
- Tunnel under the Świna in ŚwinoujściePLN 0.91 billion
- Pomeranian Metropolitan Railway (new line Gdańsk Wrzeszcz – Airport – Kartuzy/Kościerzyna)PLN 0.91 billion
- Reconstruction of national road DK18 to A18 motorway standard (southern carriageway)PLN 0.90 billion
- Modernisation of railway line Warsaw – Łódź (lines no. 1 and 17), stages I and IIPLN 0.87 billion
- DCT Gdańsk deepwater container terminal (Baltic Hub) – Terminal T2PLN 0.86 billion
- A4 Motorway Kraków – SzarówPLN 0.84 billion
- DCT Gdańsk Deepwater Container Terminal (Baltic Hub) – Terminal T1PLN 0.80 billion
- Warsaw-Radom Airport (expansion of the Radom-Sadków airport)PLN 0.80 billion
- Modernisation of tram and trolleybus infrastructure in the Upper Silesian Agglomeration, together with accompanying infrastructure (POIiŚ 2007–2013)PLN 0.80 billion
- W-Z Route in Łódź (Retkinia–Widzew tram line, extended to Olechów)PLN 0.75 billion
- Wrocław – Tramwaj Plus Programme (Integrated Rail Transport System in the Agglomeration and in Wrocław – Stage I)PLN 0.74 billion
- S7 Expressway Skarżysko-Kamienna – WystępaPLN 0.72 billion
- Tram to Wilanów (Warsaw)PLN 0.69 billion
- S8 Expressway Jeżewo – Białystok (to the Choroszcz interchange)PLN 0.68 billion
- Construction of the Olsztyn tram network with a Solaris Tramino fleet (revival of trams)PLN 0.65 billion
- Krakow Fast Tram stage III: Krowodrza Górka - Górka NarodowaPLN 0.60 billion
- Modernization of the fairway and expansion of quays in the Inner Port in Gdańsk (stage 1)PLN 0.60 billion
- Tram Route to Naramowice (Poznań)PLN 0.55 billion
- ORLEN Maritime Transshipment Terminal on the Martwa Wisła at the Gdańsk RefineryPLN 0.50 billion
- Expansion of Warsaw-Modlin Airport (Stages I and II)PLN 0.50 billion
- S22 Expressway Elbląg – Grzechotki (border with Russia)PLN 0.48 billion
- Lublin Airport (Świdnik): construction of a new regional airportPLN 0.48 billion
- Warsaw-Modlin AirportPLN 0.45 billion
- Construction of the tram line to Fordon in BydgoszczPLN 0.44 billion
- Expansion of the Passenger Terminal at Kraków-Balice Airport (2013–2016)PLN 0.41 billion
- Expansion of Warsaw Chopin Airport (Terminal A)PLN 0.40 billion
- A4 Motorway Krakow–Katowice (Poland's first toll motorway)PLN 0.38 billion
- Łódź Regional Tramway (ŁTR)PLN 0.28 billion
- Os. Lecha – Franowo tram route (with tunnel) in PoznańPLN 0.26 billion
- Kraków Fast Tram (KST): the 'Kraków Premetro' Programme (Stage I with Tunnel, Stage II)PLN 0.21 billion
- Świnoujście Offshore Terminal – ORLEN Neptun Offshore Wind Farm Installation TerminalPLN 0.17 billion
- A2 Motorway (Świecko–Poznań–Łódź–Warsaw section)n/a
- S8 Expressway Wrocław (Magnice) – Kłodzkon/a
- Warsaw Metro – Line 1 (M1) Kabaty–Młocinyn/a
- Central Trunk Line (Line 4) upgrade to 200 km/h for Pendolino (Grodzisk Maz. – Zawiercie)n/a
- Modernization of line No. 201 Maksymilianowo – Gdynia (coal trunk line, access to the Port of Gdynia)n/a
- Naftoport – Marine Crude Oil and Fuels Transhipment Terminal at Port Północny, Gdańskn/a
- First modernisation of railway line E20 on the Warsaw – Poznań – Kunowice section (PHARE/ISPA/EIB, 160 km/h)n/a
- Poznań Fast Tram (PST), northern trunk (“Pestka”)n/a
- Rail Baltica – Polish E75 Section (Warsaw – Białystok – Ełk – Trakiszki)n/a
- Terminal 1 of Warsaw-Okęcie Airport (1992)n/a
- Warsaw Agglomeration Ring Road (A50/S50)PLN 18 billion
- Krakow Metro – Line 1 (M1)PLN 13 billion
- Silesian CanalPLN 11 billion
- Warsaw railway junction: modernization of the cross-city line + second cross-city line (tunnel under the Vistula)PLN 9.0 billion
- Warsaw Metro Line III – Stage I (Praga-Południe, Stadion Narodowy – Gocław)PLN 6.0 billion
- Protective Breakwaters of the Outer Port in GdyniaPLN 0.54 billion
- Expansion of the A4 Motorway Krzyżowa–Legnica–Wrocław (+ S5 Sobótka–Bolków)n/a
- Tramwaje Śląskie – modernization and development of tram infrastructure in the Metropolis GZM (Górnośląsko-Zagłębiowska Metropolia) (FEnIKS 2021-2027)PLN 1.3 billion
- CPK Rail Spokes (hub-and-spoke model)n/a
All fields
The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.