S7 Expressway Skarżysko-Kamienna – Występa

completedstage: operationaldelivered
PLN 719 million
programme budget (multi-year) · data from 2011net or gross: not recorded≈ PLN 719 million (value-by-stage, est., nominal)funding: EU funds

A construction section of the S7 expressway (part of the 'Construction of the S7 road Radom (Jedlińsk) – Jędrzejów' project) between Skarżysko-Kamienna and Występa, 16.67 km long, built in the Świętokrzyskie voivodeship as a dual-carriageway expressway bypassing Suchedniów, Ostojów, Łączna and Występa. The beneficiary and investor was the General Directorate for National Roads and Motorways (GDDKiA), and the project was co-financed from the European Regional Development Fund. The contract for the main construction works (worth PLN 527,427,694.39) was concluded on 27 January 2009 with the consortium of Strabag Sp. z o.o. (leader) and Mota-Engil S.A. (partner); the section was opened to traffic on 28 April 2011. The total project value was PLN 719,147,926.92, of which EU co-financing reached PLN 504,927,128.99. The task included the construction of 29 engineering structures, including viaducts, bridges, two road interchanges (Suchedniów and Zalezianka), wildlife crossings, and noise barriers and other environmental protection measures.

How it went

Assessment: settled, as of 25 Jul 2026. This is our reading, not a verdict, and we show it only where a quote from a source listed below stands behind it. Of the four, 2 carry no assessment yet, one has an assessment with no confirmed quote. How to read this section

Deliverydelivered[1]

Timeline

  1. Construction start27 Jan 2009
  2. Delivery28 Apr 2011

Significance

The Skarżysko-Kamienna – Występa S7 section took transit traffic on national road no. 7 (the Warsaw – Kraków route) away from the localities of Suchedniów, Ostojów, Łączna and Występa, replacing the former route through built-up areas with a new dual-carriageway expressway. The project formed part of the construction of the S7 corridor in the Świętokrzyskie voivodeship and was one of the region's larger road projects co-financed from European funds during that period.

Sources 4 · 4 independent

Every fact on this card comes from the sources below. Next to each source – which fields it supports.

Independence is counted the same way the gate that admits a record counts it: subdomains and titles from one publisher are a single voice, Wikipedia is zero. That is why the number is lower than the number of links. Three is the minimum.

  1. Generalna Dyrekcja Dróg Krajowych i Autostrad
    StatusStageConstruction startDelivery
    Status · Stage · DeliveryDrogę oddano do ruchu 28 kwietnia 2011 r.
    Construction startData podpisania umowy: 27.01.2009 r.
  2. Mapa Dotacji UE (Ministerstwo Funduszy i Polityki Regionalnej)
    CostInvestorFunding
    Costwartość projektu 719 147 926,92 zł
    Investornazwa beneficjenta Generalna Dyrekcja Dróg Krajowych i Autostrad
    Fundingdofinansowanie z UE 504 927 128,99 zł
  3. Komisja Europejska – Inforegio (DG REGIO, projects database)4 Aug 2014
  4. Auto Świat28 Apr 2011
    StatusStage
    Status · StageW środę wieczorem kierowcy mogli pierwszy raz pojechać nowo wybudowanym 17 km odcinkiem drogi ekspresowej S7 Warszawa-Kraków w Świętokrzyskiem, między Skarżyskiem-Kamienną a Występą.