Field

Environment in Poland

16 strategic investments in this field. In progress: 2, completed: 11. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.

16projects in the database
PLN 57 billionvalue-by-stage (nominal, est.)
2in progress
11completed
1paused
2superseded

14 of 16 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.

Projects in this field

Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.

  1. National Municipal Wastewater Treatment Programme (KPOŚK)PLN 29 billionunder construction2027about 12 years late8 src.
  2. Expansion of the Water and Wastewater System of the Warsaw Agglomeration (Czajka, FEnIKS phase)PLN 0.55 billionunder construction20286 src.
  3. Programme for the Oder 2006 (multi-year programme for the modernisation of the Oder Water System)PLN 9.0 billionsuperseded10 src.
  4. Odra and Vistula Basin Flood Protection Project (POPDOW)PLN 5.2 billioncompletedfreshly completed2025about 2 years late8 src.
  5. Expansion and Modernisation of the 'Czajka' Wastewater Treatment Plant in Warsaw (with transmission system and sludge incineration plant)PLN 3.7 billioncompleted20125 src.
  6. Świnna Poręba water reservoir (Lake Mucharskie)PLN 2.2 billioncompleted20176 src.
  7. Odra River Basin Flood Protection Project (POPDO; World Bank loan 7436-PL, and CEB financing)PLN 2.2 billioncompleted202067 mo. late7 src.
  8. Racibórz Dolny flood-control reservoirPLN 2.0 billioncompleted202041 mo. late7 src.
  9. Modernisation of the Wrocław Water Node (rebuilding of Wrocław's flood protection system)PLN 1.4 billioncompleted20183 src.
  10. Improvement of Water Quality in Szczecin (Pomorzany and Zdroje Treatment Plants, ISPA/Cohesion Fund)PLN 1.1 billioncompleted20104 src.
  11. Malczyce barrage on the OderPLN 1.1 billioncompleted2018about 9 years late4 src.
  12. Water Supply and Wastewater Treatment in Łódź (Cohesion Fund Project 2004-2006)PLN 0.71 billioncompleted4 src.
  13. Modernization of the regulatory structures of the border OderPLN 0.47 billioncompletedfreshly completed20248 src.
  14. Płaszów II Wastewater Treatment Plant in Kraków (Cohesion Fund / ISPA)PLN 0.37 billioncompleted20104 src.
  15. Siarzewo Barrage on the VistulaPLN 7.5 billionpaused2032about 7 years late7 src.
  16. Flood Protection Programme for the Upper Vistula BasinPLN 13 billionsuperseded4 src.

All fields

The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.