Field
Industry in Poland
48 strategic investments in this field. In progress: 11, completed: 30. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.
41 of 48 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.
Projects in this field
Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.
- Polimery Police (PDH and polypropylene installation)PLN 7.2 billion
- IONWAY cathode materials plant (Umicore + PowerCo/VW) in NysaPLN 7.3 billion
- Mercedes-Benz electric van factory (VAN.EA) in JaworPLN 4.3 billion
- HBO Project – Hydrocracking Oil Block at the Gdańsk RefineryPLN 1.8 billion
- Second-Generation Bioethanol Complex in Jedlicze (Orlen Południe)PLN 1.1 billion
- SK Nexilis copper foil factory in Stalowa WolaPLN 3.0 billion
- Orlen Olefiny III (original scope)PLN 51 billion
- Olefins III / Nowa Chemia (petrochemical complex in Płock)PLN 36 billion
- LG Energy Solution Wrocław battery gigafactory (Biskupice Podgórne) – expansionsPLN 14 billion
- Głogów Głęboki-Przemysłowy (deposit access program, shafts GG-1/GG-2/Retków)PLN 9.0 billion
- Program 10+ (expansion of the Grupa LOTOS refinery in Gdańsk)PLN 5.5 billion
- PX/PTA Complex – Paraxylene Plant (Płock) and Terephthalic Acid Plant (Włocławek), PKN OrlenPLN 4.1 billion
- Daewoo-FSO Motor car plant at Żeran (Warsaw)PLN 3.7 billion
- Volkswagen Crafter factory in WrześniaPLN 3.4 billion
- Bzie-Dębina coking coal mine (JSW)PLN 3.0 billion
- Mercedes-Benz engine and battery plant in JaworPLN 2.6 billion
- Pyrometallurgy Modernisation Programme – flash furnace at the Głogów Copper SmelterPLN 2.5 billion
- EFRA Project (Effective Refining) – Delayed Coking Complex, Grupa LOTOS Refinery in GdańskPLN 2.3 billion
- Toyota Motor Manufacturing Poland – engine and gearbox plant in WałbrzychPLN 2.1 billion
- Basell Orlen Polyolefins – Polypropylene and Polyethylene Plants in PłockPLN 2.0 billion
- LG cluster in Kobierzyce/Biskupice Podgórne (LG.Philips LCD / LG Display, LG Electronics)PLN 1.7 billion
- Lubiatów–Międzychód–Grotów (LMG) oil and gas field, PGNiGPLN 1.7 billion
- Expansion of Fertiliser Production Capacity at Anwil (Włocławek)PLN 1.7 billion
- Fiat-GM Powertrain / FCA Powertrain engine plant in Bielsko-Biała (1.3 MultiJet)PLN 1.6 billion
- Mondi Świecie – New MP7 Paper Machine and Packaging LinePLN 1.5 billion
- New ArcelorMittal Poland Hot Rolling Mill in Kraków (former Sendzimir Steelworks)PLN 1.2 billion
- PepsiCo (Frito-Lay) plant in Święte near Środa ŚląskaPLN 1.0 billion
- Expansion of the Żelazny Most Mining Waste Disposal Facility – Southern QuarterPLN 1.0 billion
- Opel / General Motors Manufacturing Poland Car Plant in GliwicePLN 0.97 billion
- Volkswagen Motor Polska – Diesel Engine Plant in PolkowicePLN 0.92 billion
- Cadbury / Cadbury Wedel (Mondelēz) Chocolate and Chewing Gum Factory in SkarbimierzPLN 0.87 billion
- Northvolt battery systems plant in Gdańsk (Northvolt Dwa)PLN 0.80 billion
- HVO plant in Płock (hydrotreatment of vegetable oils)PLN 0.80 billion
- Isuzu Motors Polska (ISPOL) Diesel Engine Plant in TychyPLN 0.77 billion
- Dell computer factory in Łódź (Olechów)PLN 0.76 billion
- Visbreaking unit at the Płock production facilityPLN 0.75 billion
- Sharp LCD module factory in Łysomice near Toruń (Sharp Manufacturing Poland, Pomorska SEZ Ostaszewo)PLN 0.60 billion
- Diesel Hydrodesulphurisation Unit HON VII (PKN Orlen, Płock)PLN 0.50 billion
- Michelin Group investments in the tyre factory in Olsztyn (former Stomil Olsztyn)PLN 0.41 billion
- MAN Truck & Bus heavy truck factory in NiepołomicePLN 0.38 billion
- Umicore cathode materials plant in Nysan/a
- Electric car factory in Jaworzno (formerly Izera / ElectroMobility Poland)PLN 4.5 billion
- HyperPIC – VIGO Photonics photonic integrated circuit factoryPLN 1.0 billion
- Gubin-Brody Complex (Lignite Mine and Power Plant)n/a
- Złoczew Open-Pit Mine (lignite for Bełchatów)n/a
- Intel semiconductor assembly and test factory near Wrocław (Miękinia)PLN 18 billion
- Izera / ElectroMobility Poland (Polish electric car)PLN 0.58 billion
- Saule Technologies (commercialization of perovskite solar cells)n/a
All fields
The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.