Field

Defence in Poland

48 strategic investments in this field. In progress: 28, completed: 18. The strip below carries the full split by status and the value-by-stage figure. The list is ordered by momentum, so whatever is closest to opening comes first, and each record carries a link to its source.

48projects in the database
PLN 108 billionvalue-by-stage (nominal, est.)
28in progress
18completed
1planned
1cancelled

30 of 48 records enter the sum: those with a stated cost, excluding parent programmes (so they are not counted alongside their sub-projects), cancelled records and foreign purchases. Amounts are nominal, in prices from various years, with no inflation adjustment; those recorded in a foreign currency are converted at a fixed rate of EUR 4.30 / USD 4.00 / SEK 0.38. An inventory for comparison, not a ledger of state spending.

Projects in this field

Ordered by momentum: build stage and proximity to opening. Each row carries the status, the opening year and the source count.

  1. Modernisation of Leopard 2A4 tanks to the Leopard 2PL standardPLN 2.4 billionunder constructionin the home stretch20275 src.
  2. Observation satellites from Airbus Defence & Space (2 satellites + receiving station)PLN 2.7 billionunder construction20274 src.
  3. F-35A base infrastructure at Świdwin (21st Tactical Air Base)PLN 2.5 billionunder construction20264 src.
  4. MikroGlob – satellite Earth observation system for the Polish Armed ForcesPLN 0.56 billionunder construction20276 src.
  5. SAN counter-drone system (component of the Tarcza Wschód programme)PLN 15 billionunder construction20286 src.
  6. East Shield (National Deterrence and Defense Programme)PLN 10 billionunder construction20289 src.
  7. Expansion of the Production Capacity of MESKO S.A.PLN 0.89 billionunder construction20286 src.
  8. National Ammunition Reserve (multi-year government programme)PLN 14 billionunder construction20295 src.
  9. Pilica+ programme (very-short- and short-range air defence, VSHORAD)PLN 3.0 billionunder construction20295 src.
  10. CAMILA – National Constellation of Earth Observation Satellites (ESA/NRP)PLN 0.22 billionunder construction20296 src.
  11. GLADIUS reconnaissance-strike UAS (SAFE 2026)PLN 9.3 billionunder construction20304 src.
  12. Expansion of the Production Capacity of Huta Stalowa Wola (Krab/Borsuk/Rak)PLN 1.4 billionunder construction20305 src.
  13. WARMATE loitering munition (400+ sets, SAFE 2026)PLN 1.1 billionunder construction20304 src.
  14. Polonization of K2PL tank production at ZM Bumar-Łabędy (Gliwice)PLN 0.85 billionunder construction20306 src.
  15. Miecznik Frigates (Arrowhead 140 type) – PGZ Stocznia Wojenna GdyniaPLN 15 billionunder construction20319 src.
  16. F-16C/D Block 52+ Multirole Fighter Acquisition Programme (Jastrząb / Peace Sky)PLN 14 billioncompleted20086 src.
  17. Development of the Cyberspace Defense Forces and cryptological investmentsPLN 10 billionunder construction5 src.
  18. KTO Rosomak Wheeled Armoured Personnel Carrier Programme (Patria AMV Licence)PLN 4.9 billioncompleted20134 src.
  19. Aegis Ashore Missile Defense Base at RedzikowoPLN 3.6 billioncompletedfreshly completed2024about 6 years late8 src.
  20. Modernisation and construction of air base infrastructure for F-16 aircraft (Poznań-Krzesiny and Łask)PLN 1.8 billioncompleted20085 src.
  21. Barrier on the Poland–Belarus border (physical barrier + electronic barrier)PLN 1.6 billioncompleted202312 mo. late11 src.
  22. US Army Equipment Long-Term Storage and Maintenance Complex in Powidz (LTESM-C)PLN 1.5 billioncompleted20233 src.
  23. Spike-LR anti-tank guided missiles (licensed production at ZM Mesko)PLN 1.5 billioncompleted20134 src.
  24. Kormoran II-class Mine Countermeasure Vessels (Project 258): Phase I (Prototype ORP Kormoran)PLN 1.2 billioncompleted20174 src.
  25. 120 mm M120 Rak self-propelled mortar: company fire modules (2016 contract)PLN 0.97 billioncompleted20196 src.
  26. Narew Programme – Short-Range Air Defence (CAMM-ER)PLN 0.93 billionunder construction20356 src.
  27. MikroSAR – SAR radar satellites for the Polish ArmyPLN 0.86 billioncompletedfreshly completed20268 src.
  28. CASA C-295M medium transport aircraft (2001 contract)PLN 0.85 billioncompleted20054 src.
  29. Gawron corvette / ORP Ślązak patrol ship (project 621/621M)PLN 0.64 billioncompleted2019about 10 years late6 src.
  30. SKYctrl counter-UAS system (Advanced Protection Systems)PLN 0.15 billioncompleted20233 src.
  31. Camp Kościuszko – forward command post of the US Army V Corps (Poznań)n/acompleted202310 src.
  32. Formation and Infrastructure of the 1st Legions Infantry Divisionn/aunder construction7 src.
  33. Coastal Missile Squadron: first squadron with the NSM system (Siemirowice)n/acompleted20137 src.
  34. Homar Programme: HIMARS rocket-artillery fire module (2019 contract)n/acompletedfreshly completed20245 src.
  35. Homar-K Programme – Rocket Artillery (K239 Chunmoo, CGR-080 production in Poland)n/aoperating, being expanded20297 src.
  36. Wisła Program – medium-range air defense (Patriot/IBCS)n/aoperating, being expanded20316 src.
  37. Regional Competence Centre for Abrams Tanks at WZM Poznańn/acompletedfreshly completed20246 src.
  38. Purchase of M-346 Master (Bielik) advanced jet trainers: 2014 contractn/acompleted20174 src.
  39. Connection of Poland to the NATO Fuel Pipeline System (CEPS)PLN 20 billionin preparation6 src.
  40. Expansion of the Production Capacity of ZM Dezamet (155 mm Ammunition)PLN 1.4 billionin preparation5 src.
  41. 155 mm powder and ammunition plant in Pionki (Eurenco / PGZ)PLN 1.1 billionin preparation20295 src.
  42. ESA Centre for Civil Security and Resilience in Warsawn/aplanned4 src.
  43. National FA-50 aircraft service centre at WZL Nr 2 (Bydgoszcz)n/ain preparation4 src.
  44. Production and servicing of K9PL self-propelled howitzers at Huta Stalowa Wolan/ain preparation7 src.
  45. Civil Protection and Civil Defense Program 2025-2026 (shelters and refuges)n/ain preparation20264 src.
  46. Autonomous Systems Centre (OSA) / development of Polish drone forcesPLN 25 billionin progress3 src.
  47. FLYEYE reconnaissance UAV (190 sets, SAFE 2026, Grupa WB)PLN 1.5 billionin progress4 src.
  48. Tender for H225M Caracal multirole helicopters (cancelled 2016)n/acancelled4 src.

All fields

The same catalogue, a different cut of it. Every record belongs to exactly one field, so these counts add up to the whole database.