PROJEKTOMETR · Poland’s megaproject database

Is Poland
really developing?

383 strategic investments – 212 current and 171 earlier landmarks added as background. Each ≥ PLN 500 million or deemed strategic. Completed, under construction, and the ones that failed. Governments of every stripe. Zero politics, sources only. Judge for yourself.

383
megaprojects in the database
PLN 1263 billion
value-by-stage (nominal, est.)
83
happening now
What Projektometr is: a database of selected strategic investments (cost ≥ PLN 500 million or strategic status), with a source link behind every fact.  What it is NOT: a full ledger of state spending, a verdict on governments, or proof that these investments drove the economy.

01Now

Right now 83 major investments are under way.

Not “someday.” Now. Roads, rail, factories, ports, power plants – all at once, across the country.

See all 83 in the filterable list

Baltic Power Offshore Wind Farm20 bnPolimery Police (PDH and polypropylene installation)7.2 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCentral Integrated Clinical Hospital in Poznań0.86 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnBaltica 2 Offshore Wind Farm30 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnIONWAY cathode materials plant (Umicore + PowerCo/VW) in Nysa7.3 bnMercedes-Benz electric van factory (VAN.EA) in Jawor4.3 bnNowy Rybnik gas-and-steam power plant (CCGT Rybnik, 882 MW)3.0 bnBaltic Power Offshore Wind Farm20 bnPolimery Police (PDH and polypropylene installation)7.2 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCentral Integrated Clinical Hospital in Poznań0.86 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnBaltica 2 Offshore Wind Farm30 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnIONWAY cathode materials plant (Umicore + PowerCo/VW) in Nysa7.3 bnMercedes-Benz electric van factory (VAN.EA) in Jawor4.3 bnNowy Rybnik gas-and-steam power plant (CCGT Rybnik, 882 MW)3.0 bn
Nowy Rybnik gas-and-steam power plant (CCGT Rybnik, 882 MW)3.0 bnMercedes-Benz electric van factory (VAN.EA) in Jawor4.3 bnIONWAY cathode materials plant (Umicore + PowerCo/VW) in Nysa7.3 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnBaltica 2 Offshore Wind Farm30 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnCentral Integrated Clinical Hospital in Poznań0.86 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bnPolimery Police (PDH and polypropylene installation)7.2 bnBaltic Power Offshore Wind Farm20 bnNowy Rybnik gas-and-steam power plant (CCGT Rybnik, 882 MW)3.0 bnMercedes-Benz electric van factory (VAN.EA) in Jawor4.3 bnIONWAY cathode materials plant (Umicore + PowerCo/VW) in Nysa7.3 bnCompletion and expansion of Warsaw metro line II (eastern-northern and western sections)10 bnNational Municipal Wastewater Treatment Programme (KPOŚK)29 bnBaltica 2 Offshore Wind Farm30 bnReconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)0.11 bnCentral Integrated Clinical Hospital in Poznań0.86 bnTram to Mistrzejowice – KST Stage IV (Krakow, PPP)1.9 bnCCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)2.0 bnModernisation of Leopard 2A4 tanks to the Leopard 2PL standard2.4 bnCCGT Ostrołęka combined-cycle gas power plant2.9 bnPolimery Police (PDH and polypropylene installation)7.2 bnBaltic Power Offshore Wind Farm20 bn

Records in progress that are at the construction or commissioning stage. Announcements, permits and tenders are left out, however close their stated deadline. Sorted by momentum (stage × proximity to opening).

02Leap

What we’ve already built.

Not plans – things that stand and work. 66 completed megaprojects of the contemporary era worth ~PLN 122 billion, across a dozen fields at once. For scale: motorways and express roads grew 7.6× in one generation (from nearly 720 km in 2004 to 5,466 km in 2025).

Roads32.6 bn PLN · 10
Gas19.2 bn PLN · 10
Factories13.6 bn PLN · 9
Data centres12.0 bn PLN · 2
Rail10.2 bn PLN · 6
Water7.6 bn PLN · 3
Ports6.5 bn PLN · 6
Defence5.4 bn PLN · 5
show all sectors (+11)
Waste-to-energy3.2 bn PLN · 3
Other2.8 bn PLN · 1
Culture2.6 bn PLN · 2
Wind1.3 bn PLN · 1
Health1.2 bn PLN · 1
Industry1.0 bn PLN · 1
Solar0.9 bn PLN · 1
Space0.9 bn PLN · 1
Airports0.8 bn PLN · 1
Energy storage0.5 bn PLN · 1
Science0.3 bn PLN · 2

Value of completed projects by sector, contemporary era only. The catalogue holds 226 records with status “completed”, but earlier landmarks are collected selectively, not systematically, so they sit outside this chart. The split is curatorial and is not a cut-off by delivery date. Figures nominal, prices from various years, not adjusted for inflation; amounts recorded in a foreign currency at the fixed rate (EUR 4.30 / USD 4.00 / SEK 0.38). Nuclear and offshore wind are excluded – they arrive here only once delivered. This is “value-by-stage”, not “total cost”. Express roads 720→5,466 km. GDDKiA: 2004 figures, 2025 figures.

Where these figures come from

What that PLN 122 billion is made of: 86.3 bn in announced budget envelopes (70%, 43 rec.), 20.9 bn in contract values (17%, 13 rec.), 15.3 bn in estimates (12%, 6 rec.). These are not settled outlays – every card states its own basis for the figure.

show the source quotes

„Wchodząc do Unii Europejskiej, 1 maja 2004 r., Polska miała blisko 720 km dróg szybkiego ruchu”

GDDKiA, 2004 · GDDKiA – Wspólnota europejska i polskie drogi

„Obecnie kierowcy mogą korzystać z niemal 5466 km dróg szybkiego ruchu, w tym ponad 1894 km autostrad i 3571 km dróg ekspresowych.”

GDDKiA, 2025 · GDDKiA – Podsumowanie 2025 roku
FoundationEarlier landmarks – 171 selected records (years shown: 1974–2027). A selection, not a full sweep; we don’t sum the values in this section. Not all of them are finished. Cancelled or superseded: 7; still in progress: 4, of which chapter 01, “Now”, also shows 2. The year on a card is the delivery year, or where none is recorded, the planned date or the year work started; cancelled and superseded records carry no year and sit in the “no date” group.
Why separately?Because only the current era is collected systematically – earlier landmarks are a selection rather than a full sweep, which is why they sit in their own section. Their costs do enter the “value-by-stage” figure, so the headline sum covers both eras.
2000s2000SwePol Link – Poland–Sweden HVDC submarine power cable2002Toyota Motor Manufacturing Poland – engine and gearbox plant in Wałbrzych2003Fiat-GM Powertrain / FCA Powertrain engine plant in Bielsko-Biała (1.3 MultiJet)2004190 MWe Combined-Cycle Gas Turbine Block at the 'Zielona Góra' CHP Plant2005Basell Orlen Polyolefins – Polypropylene and Polyethylene Plants in Płock2005CASA C-295M medium transport aircraft (2001 contract)2006Modernisation of railway line Warsaw – Łódź (lines no. 1 and 17), stages I and II2007New ArcelorMittal Poland Hot Rolling Mill in Kraków (former Sendzimir Steelworks)2007DCT Gdańsk Deepwater Container Terminal (Baltic Hub) – Terminal T12007Dell computer factory in Łódź (Olechów)2007Electronic Platform for Collecting, Analysing and Sharing Digital Resources on Medical Events (P1, e-Health)2007LG cluster in Kobierzyce/Biskupice Podgórne (LG.Philips LCD / LG Display, LG Electronics)2007MAN Truck & Bus heavy truck factory in Niepołomice2007Sharp LCD module factory in Łysomice near Toruń (Sharp Manufacturing Poland, Pomorska SEZ Ostaszewo)2007Siekierkowski Bridge and Siekierkowska Route in Warsaw2008Modernisation and construction of air base infrastructure for F-16 aircraft (Poznań-Krzesiny and Łask)2008F-16C/D Block 52+ Multirole Fighter Acquisition Programme (Jastrząb / Peace Sky)2008Łódź Regional Tramway (ŁTR)2008Warsaw Metro – Line 1 (M1) Kabaty–Młociny2008464 MW Power Unit at the Pątnów II Power Plant (first supercritical-parameter unit in the National Power System)2008S22 Expressway Elbląg – Grzechotki (border with Russia)2009A4 Motorway Kraków – Szarów2009A4 Motorway Zgorzelec – Krzyżowa2009First modernisation of railway line E20 on the Warsaw – Poznań – Kunowice section (PHARE/ISPA/EIB, 160 km/h)2009460 MW power generating unit (supercritical CFB) at Łagisza Power Station2009Mondi Świecie – New MP7 Paper Machine and Packaging Line
2010s2010Cadbury / Cadbury Wedel (Mondelēz) Chocolate and Chewing Gum Factory in Skarbimierz2010Copernicus Science Centre in Warsaw2010Diesel Hydrodesulphurisation Unit HON VII (PKN Orlen, Płock)2010Ergo Arena (indoor arena on the border of Gdańsk and Sopot)2010Improvement of Water Quality in Szczecin (Pomorzany and Zdroje Treatment Plants, ISPA/Cohesion Fund)2010S3 Expressway Szczecin – Gorzów Wielkopolski2010Poznań Stadium (redevelopment for UEFA Euro 2012)2010Płaszów II Wastewater Treatment Plant in Kraków (Cohesion Fund / ISPA)2011Wrocław Motorway Bypass A8 (including the Rędzin Bridge over the Oder)2011A1 Motorway Gdańsk–Toruń (Gdańsk Transport Company concession section)2011858 MW power unit at the Bełchatów Power Plant2011Program 10+ (expansion of the Grupa LOTOS refinery in Gdańsk)2011PX/PTA Complex – Paraxylene Plant (Płock) and Terephthalic Acid Plant (Włocławek), PKN Orlen2011S7 Expressway Skarżysko-Kamienna – Występa2011S8 Expressway Konotopa – Powązkowska (Trasa Armii Krajowej, Warsaw)2011Stadium in Gdańsk (EURO 2012)2011Municipal Stadium in Wrocław (Tarczyński Arena / Stadion Wrocław)2012A1 motorway Pyrzowice – Piekary Śląskie2012A1 motorway Sośnica (Gliwice) – Gorzyczki (the Silesian A1 section, via Świerklany)2012A2 Motorway (Świecko–Poznań–Łódź–Warsaw section)2012Expansion and Modernisation of the 'Czajka' Wastewater Treatment Plant in Warsaw (with transmission system and sludge incineration plant)2012Lublin Airport (Świdnik): construction of a new regional airport2012Maria Skłodowska-Curie Bridge (North Bridge) in Warsaw with the North Bridge Route2012National Teleinformatics Network for Emergency Number 112 (OST 112)2012Green Unit at the Połaniec Power Plant (a power unit fired 100% by biomass, 205 MW)2012Warsaw-Modlin Airport2012S7 Expressway – Southern Gdańsk Bypass (Straszyn – Koszwały)2012S8 Expressway Jeżewo – Białystok (to the Choroszcz interchange)2012Os. Lecha – Franowo tram route (with tunnel) in Poznań2012Wrocław – Tramwaj Plus Programme (Integrated Rail Transport System in the Agglomeration and in Wrocław – Stage I)2013A4 Motorway Jarosław – Korczowa (Ukrainian border)2013Coastal Missile Squadron: first squadron with the NSM system (Siemirowice)2013KTO Rosomak Wheeled Armoured Personnel Carrier Programme (Patria AMV Licence)2013Lubiatów–Międzychód–Grotów (LMG) oil and gas field, PGNiG2013Protective breakwater for the external port in Świnoujście (LNG terminal shelter)2013Purchase of 186 PESA 120Na Swing trams for Tramwaje Warszawskie2013Purchase of 35 Siemens Inspiro trains for the Warsaw Metro2013Spike-LR anti-tank guided missiles (licensed production at ZM Mesko)2014A1 motorway Toruń–Stryków (GDDKiA's central section, POIiŚ)2014A1 motorway Świerklany – Gorzyczki (Czech border, the Mszana bridge)2014A1 motorway Toruń Południe – Kowal (Czerniewice–Kowal section, part of the A1 Toruń–Stryków build)2014A4 Motorway Tarnów (Krzyż interchange) – Rzeszów (Rzeszów Wschód interchange), including a section of the S19 expressway (Rzeszów Zachód interchange – Świlcza interchange)2014European Solidarity Centre in Gdańsk2014Mieczysław Karłowicz Philharmonic in Szczecin2014ICE Kraków Congress Centre2014POLIN Museum of the History of Polish Jews in Warsaw2014S3 Expressway, Gorzów Wielkopolski – Sulechów section2014S8 Expressway, Walichnowy interchange – Łódź (A1) section (Wrocław – Łódź direction)2014NOSPR Headquarters in Katowice2014Purchase of Pendolino ED250 trains (PKP Intercity)2015Construction of the Olsztyn tram network with a Solaris Tramino fleet (revival of trams)2015e-Taxes / e-Declarations (Ministry of Finance IT projects programme, POIG Priority Axis 7, 2007–2015)2015Eastern Poland Broadband Network (SSPW)2015Expansion of the Wierzchowice Underground Gas Storage Facility to 1.2 bcm2015GAZ-SYSTEM 2009–2015 investment programme (trunk pipelines of the North–South Gas Corridor)2015International Congress Centre in Katowice2015Internet for Masovia (Regional Broadband Network of the Masovian Voivodeship)2015Kraków Fast Tram (KST): the 'Kraków Premetro' Programme (Stage I with Tunnel, Stage II)2015LitPol Link (the power bridge): 400 kV Poland–Lithuania electricity interconnection, Ełk–Olita/Alytus2015W-Z Route in Łódź (Retkinia–Widzew tram line, extended to Olechów)2015Modernisation of railway line E20, Siedlce – Terespol section2015Witold Lutosławski National Forum of Music in Wrocław2015National Synchrotron Radiation Centre SOLARIS in Kraków2015New Seat of the Silesian Museum in Katowice (site of the former "Katowice" Hard Coal Mine)2015Pomeranian Metropolitan Railway (new line Gdańsk Wrzeszcz – Airport – Kartuzy/Kościerzyna)2015Purchase of 20 Stadler/Newag FLIRT (ED160) electric multiple units for PKP Intercity2015Regional Broadband Networks (RSS) – Regional Operational Programmes 2007–20132015Expansion of Warsaw Chopin Airport (Terminal A)2015S69 Expressway (now S1) Bielsko-Biała – Żywiec – Zwardoń2015Modernisation of tram and trolleybus infrastructure in the Upper Silesian Agglomeration, together with accompanying infrastructure (POIiŚ 2007–2013)2015President Lech Kaczyński LNG Terminal in Świnoujście2015Warsaw Metro Line 2 (M2) – Central Section (Rondo Daszyńskiego – Dworzec Wileński)2015Wielkopolska Broadband Network (WSS)2016A1 motorway Stryków (Łódź Północ) – Tuszyn (eastern Łódź bypass)2016A4 Motorway Rzeszów Wschód – Jarosław Zachód2016Construction of the tram line to Fordon in Bydgoszcz2016DCT Gdańsk deepwater container terminal (Baltic Hub) – Terminal T22016Expansion of the Passenger Terminal at Kraków-Balice Airport (2013–2016)2016Municipal Waste Thermal Treatment Plant (ZTPOK/ITPOK) in Bydgoszcz2016Municipal Waste Thermal Treatment Plant (ITPOK) in Poznań2016Purchase of 20 Pesa Dart ED161 electric multiple units for PKP Intercity2016Waste Thermal Treatment Plant in Kraków (Ekospalarnia)2017Central Trunk Line (Line 4) upgrade to 200 km/h for Pendolino (Grodzisk Maz. – Zawiercie)2017EcoGenerator Waste Thermal Treatment Plant in Szczecin2017Kormoran II-class Mine Countermeasure Vessels (Project 258): Phase I (Prototype ORP Kormoran)2017B11 Power Generating Unit (1,075 MW, Hard Coal) at Kozienice Power Plant2017Purchase of M-346 Master (Bielik) advanced jet trainers: 2014 contract2017Modernisation of railway line E30/C-E30 Kraków – Rzeszów (Podłęże – Rzeszów section, stage III)2017Museum of the Second World War in Gdańsk2017Reconstruction of the Silesian Stadium in Chorzów (2009–2017)2017Świnna Poręba water reservoir (Lake Mucharskie)2018Malczyce barrage on the Oder2018Modernisation of the Wrocław Water Node (rebuilding of Wrocław's flood protection system)2018CCGT Combined-Cycle Gas-and-Steam Unit in Płock (PKN Orlen, approx. 600 MW)2018Construction of the S3 Expressway Gorzów Wielkopolski – Nowa Sól, Sulechów (Kruszyna interchange) – Nowa Sól section (second carriageway of the S3 and second carriageways of the Gorzów Wielkopolski and Międzyrzecz bypasses)2018S7 Expressway Gdańsk – Elbląg (Koszwały – Kazimierzowo)2018S8 Expressway Wyszków – Mazowieckie/Podlaskie voivodeship border (Warsaw – Białystok direction)2019120 mm M120 Rak self-propelled mortar: company fire modules (2016 contract)2019A1 motorway Częstochowa – Pyrzowice2019EFRA Project (Effective Refining) – Delayed Coking Complex, Grupa LOTOS Refinery in Gdańsk2019Gawron corvette / ORP Ślązak patrol ship (project 621/621M)2019Opole Power Plant – Units 5 and 6 (2×900 MW, hard coal)2019pl.ID - the Polish ID Card (electronic identity document)2019S5 Expressway Poznań – Wrocław

03What’s coming

More is scheduled for 2026–2032 than opened in 2020–2025.

The headline is about one time window, not the whole chart. Counting openings, more of them are already behind us than ahead. Records in progress or planned with no stated opening year get no bar here, so the future sits lower on the chart than the data would put it. By value, the two tallest bars fall in 2035 and 2036, and two records fill most of them, the “Y” high-speed railway and the first nuclear power plant, both on declared dates.

% of GDP (share of the economy in the year the cost figure comes from)
Show the figures (table)
Value by opening year – data table
YearDelivered % GDPPlanned % GDP% of GDPProjects
<19950.38%0%0.38%4
19950%0%0%0
19961.07%0%1.07%1
19970%0%0%3
19980.22%0%0.22%1
19990.23%0%0.23%2
20000.17%0%0.17%1
20010%0%0%0
20020.26%0%0.26%1
20030.19%0%0.19%1
20040.06%0%0.06%1
20050.2%0%0.2%1
20060%0%0%0
20070.66%0%0.66%7
20080.33%0%0.33%5
20090.4%0%0.4%5
20100.41%0%0.41%7
20111.67%0%1.67%9
20121.07%0%1.07%14
20131.26%0%1.26%8
20141.51%0%1.51%12
20151.52%0%1.52%21
20160.68%0%0.68%11
20171.01%0%1.01%11
20180.53%0%0.53%6
20191.24%0%1.24%9
20200.54%0%0.54%4
20211.02%0%1.02%7
20220.77%0%0.77%11
20230.9%0%0.9%17
20240.42%0%0.42%10
20250.98%0%0.98%13
20260.11%1.49%1.6%26
20270%1.77%1.77%16
20280%1.22%1.22%18
20290%0.34%0.34%12
20300%1.35%1.35%13
20310%1.64%1.64%4
20320%1.37%1.37%8
20330%0%0%1
20340%0%0%0
20350%3.18%3.18%4
20360%5.26%5.26%1
2037+0%0%0%2
delivered (already open)in progress / plannedincl. overdue (was already due)verified through 2026; right of this line – the scheduled pipeline, not yet delivered
Each project counts as a share of GDP in the year its amount comes from, not the year it opens. Read on

Projects opened in 2020–2025 sum to ~4.63% (≈0.77%/yr). The 2026–2032 window carries ~9.29% (≈1.33%/yr), almost all of it a declared pipeline rather than delivered openings or annual spending. The chart omits records with no stated opening year, and far more of those are under construction or planned than delivered, so the pipeline reads low here. Future dates are declared dates – some will slip.

How this chart is computed

Sorted by opening year (completed → year delivered; the rest → current planned date). Bar size = share of GDP (cost ÷ nominal GDP of the year the cost figure comes from), not nominal cost – so projects from different eras compare fairly despite inflation and the 1995 redenomination. Size is measured against GDP in the price year where the source gives one; for amounts converted from a foreign currency, the year of the exchange rate; otherwise the year of the cost figure’s date, and where that is missing too, a year from the record’s timeline (delivery first, then the planned date, start and announcement). 0 with a stated price year, 251 from one of the other three. A further 57 projects enter the bars’ counts but carry no recorded cost, so they add nothing to the height: the count rests on 308 records, the height on 251.

macro backdrop – about the economy, not project costs

For “since 1990” context: Poland’s real GDP (constant prices) grew +237% since 1990 – the most in the region (Czechia +81%, Germany +55%). This measures the scale of the economy, not prosperity, and is not project cost. Separately: GDP per capita in PPS rose from 51 to 79% of the EU average (2004→2024). World Bank, Eurostat. Backdrop, not proof. The GDP growth figure we compute ourselves from a World Bank series, the PPS index is read from a Eurostat table, and the road kilometres carry a quote from a primary source. Only that third figure meets the bar every project field has to clear.

04Honestly

Not everything worked. And it’s good that you can see it.

Among the 79 current records that are completed or stopped (cancelled, superseded, paused), 14 did not work out, about 18%. A project under construction or planned has no outcome yet either way, so it is not in the denominator. “Failed” means here: cancelled, superseded, paused, or carrying a shortfall material to the project's scale (established, named by an audit, or under investigation). The full list is longer (21), because it also holds failures among the earlier landmarks (7). The rule does not count delays or overruns, and there are far more of those: where a source speaks about the schedule, 86 of 99 records ran late, and where it speaks about the budget, 25 of 30 are over it. Those two fractions run over the whole database, including records in progress and landmarks. None of these figures is a rate for Polish investment as a whole: the database is a selection, not a random sample, a withdrawn announcement gets its outcome sooner than a finished build, and sources report a slip more often than a deadline kept. The “Failed” pill in the catalogue follows the same rule, and each of these figures can be reproduced from /api/projekty.json and /api/statystyki.json. We show failures with the same source rigour as successes; they’re rarely black-and-white.

This is why the list reads as one-sided in time: a verdict (cancellation, replacement, or an established shortfall) by its nature takes years, so any large investment active today may not have one yet, regardless of when it started. The Central Transport Hub (CPK) and the second nuclear plant are still under way, and the rule above cannot rule on them yet. That does not mean they are faring any better, only that nothing is settled yet.

And even these are rarely black-and-white: Izera was cancelled, and the company that developed it is preparing a different car with Foxconn under a new brand. The post-Northvolt battery factory in Gdańsk is not on the list, although its investor went bankrupt: a new owner restarted production there. Every case is in the database – with full context.

Above: 5 examples picked by hand, one per kind of failure – this is not a ranking of losses. All 21 records sit on a page of their own: the full “Failed” list.

05Where

Where it’s being built.

Where it’s being built – by voivodeship. Circle size is the number of projects in the region (not value). The point map and filters are in the “All projects” section.

Śląskie: 37 projects · PLN 73.2 billionOpolskie: 8 projects · PLN 17.6 billionWielkopolskie: 29 projects · PLN 143 billionZachodniopomorskie: 25 projects · PLN 67.8 billionŚwiętokrzyskie: 8 projects · PLN 6.3 billionKujawsko-pomorskie: 21 projects · PLN 60.0 billionPodlaskie: 13 projects · PLN 50.0 billionDolnośląskie: 38 projects · PLN 169 billionPodkarpackie: 21 projects · PLN 54.7 billionMałopolskie: 28 projects · PLN 72.0 billionPomorskie: 59 projects · PLN 397 billionWarmińsko-mazurskie: 17 projects · PLN 65.1 billionŁódzkie: 26 projects · PLN 125 billionMazowieckie: 94 projects · PLN 364 billionLubelskie: 13 projects · PLN 39.3 billionLubuskie: 13 projects · PLN 9.4 billion

Tap a region (or hover) to see its breakdown.

Circle colour is the field with the most projects in the voivodeship:Transporttie (several fields with the same count)EnergyDefence

358 projects on the map; circle size = number of projects in the voivodeship (not value). Regional counts add up to more than 358 because 58 projects span several voivodeships. The same applies to the amounts: a multi-region project enters each of them at full value, so the regional figures must not be added up – they come to about 44% more than those records do. 24 sensitive sites are counted at voivodeship level (no precise point). 25 projects have no assigned region – off the map.

Full map and table →

06All projects

Now it’s your turn.

Start from a field

9 indexes, each with a summary and the full project list. Filters and the map are below.

383 projects, PLN 1,263 billion

The buckets divide the database with nothing left over: 83 + 226 + 45 + 9 + 20 = 383. The last term is the stopped records: cancelled, superseded or paused. “Failed” (21) is not one more bucket but a cut across them: it covers every stopped record, and beyond those the live or completed ones where a source states a material shortfall. Adding this pill to the rest would therefore count some records twice.

what is momentum?

Momentum = how close a project is to opening: build stage × proximity to its date. “Now” and “home stretch” rank above early plans. Two buckets sit outside that scale because they describe a state rather than a distance from opening: “partly in service” is a project whose first part already runs while the rest is built, and “failed” cuts across the other buckets instead of being one more.

how it went:

The number on a label counts the records where a source names that outcome. It does not say the rest went differently: more often it means we have no quote about them.

opening:
all
19742040
in the home stretch
Energy · 2026

Baltic Power Offshore Wind Farm

PLN 20 billion
under construction
10 src.
in the home stretch
Industry · 2027

Polimery Police (PDH and polypropylene installation)

PLN 7.2 billion
under construction
10 src.8 yearsdelayed
in the home stretch
Energy · 2026

CCGT Ostrołęka combined-cycle gas power plant

PLN 2.9 billion
under construction
8 src.under a yeardelayedover budget
pre-2020in the home stretch
Defence · 2027

Modernisation of Leopard 2A4 tanks to the Leopard 2PL standard

PLN 2.4 billion
under construction
5 src.
in the home stretch
Energy · 2026

CCGT Grudziądz gas-and-steam power plant (Unit I, 563 MW)

PLN 2.0 billion
under construction
9 src.
in the home stretch
Transport · 2026

Tram to Mistrzejowice – KST Stage IV (Krakow, PPP)

PLN 1.9 billion
under construction
7 src.under a yeardelayed
in the home stretch
Health · 2027

Central Integrated Clinical Hospital in Poznań

PLN 0.86 billion
under construction
10 src.2 yearsdelayedover budget
in the home stretch
Transport · 2026

Reconstruction of the runway and taxiways at Rzeszów-Jasionka Airport (CEF Military Mobility)

PLN 0.11 billion
under construction
7 src.
under construction
Energy · 2027

Baltica 2 Offshore Wind Farm

PLN 30 billion
under construction
8 src.
pre-2020under construction
Environment · 2027

National Municipal Wastewater Treatment Programme (KPOŚK)

PLN 29 billion
under construction
8 src.12 yearsdelayed
under construction
Transport · 2026

Completion and expansion of Warsaw metro line II (eastern-northern and western sections)

PLN 10 billion
under construction
7 src.4 yearsdelayed
under construction
Industry · 2026

IONWAY cathode materials plant (Umicore + PowerCo/VW) in Nysa

PLN 7.3 billion
under construction
6 src.
under construction
Industry · 2026

Mercedes-Benz electric van factory (VAN.EA) in Jawor

PLN 4.3 billion
under construction
6 src.
under construction
Energy · 2027

Nowy Rybnik gas-and-steam power plant (CCGT Rybnik, 882 MW)

PLN 3.0 billion
under construction
8 src.+3 mo.delayed
under construction
Defence · 2027

Observation satellites from Airbus Defence & Space (2 satellites + receiving station)

PLN 2.7 billion
under construction
4 src.
under construction
Defence · 2026

F-35A base infrastructure at Świdwin (21st Tactical Air Base)

PLN 2.5 billion
under construction
4 src.
under construction
Digital · 2026

NRRP C1.1.1 – high-speed internet in white-spot areas

PLN 2.5 billion
under construction
5 src.
under construction
Transport · 2027

S10 Expressway Bydgoszcz – Toruń

PLN 2.1 billion
under construction
3 src.
under construction
Energy · 2027

Miejska Górka Wind Farm (TAURON Zielona Energia)

PLN 2.0 billion
under construction
6 src.
under construction
Transport · 2027

Vistula Spit Canal and Waterway to Elbląg

PLN 2.0 billion
under construction
9 src.4 yearsdelayedover budget
under construction
Industry · 2026

HBO Project – Hydrocracking Oil Block at the Gdańsk Refinery

PLN 1.8 billion
under construction
5 src.
under construction
Energy · 2027

Żarnowiec Battery Energy Storage System (BESS, 262 MW / 981 MWh)

PLN 1.6 billion
under construction
7 src.
under construction
Digital · 2026

Cyber-Secure Local Government (and the FERC/KPO continuation)

PLN 1.5 billion
under construction
8 src.+3 mo.delayed
under construction
Health · 2027

New Oncology Hospital in Wrocław (DCOPiH)

PLN 1.5 billion
under construction
6 src.
under construction
Transport · 2026

Szczecin Metropolitan Railway

PLN 1.4 billion
under construction
6 src.+76 mo.delayed
under construction
Transport · 2027

Expansion and Modernisation of Poznań-Ławica Airport

PLN 1.3 billion
under construction
6 src.
under construction
Culture · 2027

Polish History Museum at the Warsaw Citadel

PLN 1.2 billion
under construction
6 src.+91 mo.delayed
under construction
Transport · 2026

T5 Terminal at the Port of Gdańsk – offshore wind installation terminal

PLN 1.2 billion
under construction
4 src.
under construction
Industry · 2027

Second-Generation Bioethanol Complex in Jedlicze (Orlen Południe)

PLN 1.1 billion
under construction
5 src.3 yearsdelayed
under construction
Health · 2026

PUM Clinical, Teaching and Research Centre at University Clinical Hospital No. 1 in Szczecin

PLN 0.81 billion
under construction
4 src.